| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/04/2016 |
140530986 |
01 |
A2 |
X SIGNED OFF |
01/25/2017 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL GAS-FIRED BOILER WITH BOILER AND GAS BURNER. INSTALL (2) NEW GAS-F
|
|
Work on Floor(s): CEL
|
| 05/25/2016 |
140498352 |
01 |
A2 |
X SIGNED OFF |
10/21/2016 |
0034329 RA |
SUNWOO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF GROUND LEVEL RETAIL SPACE FOR A CAFE.
|
|
Work on Floor(s): 001
|
| 10/14/2014 |
122165352 |
01 |
A2 |
R PERMIT-ENTIRE |
10/24/2014 |
0024178 RA |
VEDMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS
|
|
Work on Floor(s): 1ST
|
| 05/10/2013 |
121615804 |
01 |
A2 |
R PERMIT-ENTIRE |
05/16/2013 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
INSTALLATION OF FIRE SUPPRESSION SYSTEM AS PER PLANS FILED HEREWITH. THER
|
|
Work on Floor(s): 001
|
| 02/15/2013 |
121536267 |
01 |
A2 |
R PERMIT-ENTIRE |
04/05/2013 |
0033846 RA |
ANASTASI |
|
NOT APPLICABLE
|
|
JOB FILED FOR KITCHEN RENOVATION: NEW EQUIPEMENTS, PAITING, PLUBMING FIXTU
|
|
Work on Floor(s): 001
|
| 06/10/1993 |
100653918 |
01 |
A3 |
P APPROVED |
06/14/1993 |
0054064 PE |
CHOY |
|
NOT APPLICABLE
|
|
SEAL THE DUMBWAITER DOOR FROM CELLAR TO 6TH FLOOR. NO CHANGE IN USE, EG
|
|
Work on Floor(s): CEL 1 thru 6
|