 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/08/2022 |
120470980 |
02 |
A2 |
P APPROVED |
08/23/2022 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 06/27/2022 |
103153962 |
02 |
A2 |
P APPROVED |
07/12/2022 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 06/27/2022 |
103769030 |
02 |
A2 |
P APPROVED |
01/31/2023 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CE1,001,002
|
| 06/22/2022 |
103806419 |
03 |
A1 |
P APPROVED |
06/28/2022 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 08/11/2020 |
104112675 |
02 |
A2 |
P APPROVED |
09/17/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 08/11/2020 |
103980505 |
02 |
A2 |
P APPROVED |
09/16/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 08/11/2020 |
104765835 |
02 |
A2 |
P APPROVED |
09/16/2020 |
|
ASIF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 08/11/2020 |
104370075 |
02 |
A2 |
P APPROVED |
09/16/2020 |
|
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/11/2020 |
104234259 |
02 |
A2 |
P APPROVED |
09/16/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/11/2020 |
103476686 |
02 |
A2 |
P APPROVED |
09/16/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003
|
| 12/26/2016 |
103800647 |
02 |
PA |
P APPROVED |
12/27/2016 |
|
WAINER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 12/20/2016 |
103806419 |
02 |
A1 |
P APPROVED |
12/21/2016 |
|
WAINER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 03/29/2016 |
140476198 |
01 |
A3 |
X SIGNED OFF |
06/06/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALL NEW FIREPROOF RUBBER DECK, REMOVE THE OLD COMBUSTIBLE DECK AT ROOF
|
|
Work on Floor(s): ROO
|
| 03/26/2016 |
140475457 |
01 |
A3 |
H P/E IN PROCESS |
03/26/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/28/2016 INSTALL NEW FIREPROOF RUBBER DECK, REMOVE THE OLD
|
|
Work on Floor(s): ROO
|
| 10/23/2015 |
122559061 |
01 |
A2 |
X SIGNED OFF |
09/20/2016 |
0013529 RA |
KATZ & A |
|
NOT APPLICABLE
|
|
MODIFICATION OF A FIRE SUPPRESSION SHUT OFF VALVE FILED UNDER APPL#1039917
|
|
Work on Floor(s): 001
|
| 08/12/2013 |
121746423 |
01 |
A2 |
X SIGNED OFF |
07/28/2014 |
0016116 RA |
WYGODA |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR EQUIPMENT USE PERMITS
|
|
Work on Floor(s): ROF
|
| 09/13/2010 |
120470980 |
01 |
A2 |
X SIGNED OFF |
08/24/2022 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
OPENING SIDE WALL NEW DOOR. ADJACENT BUILDING'S APPLICATION IS UNDER #1031
|
|
Work on Floor(s): 001
|
| 05/16/2007 |
104765835 |
01 |
A2 |
X SIGNED OFF |
10/21/2020 |
0017617 RA |
ASIF |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR APARTMENT 6B @6TH FLOOR, INSTALL PLUMBING FIXTURES
|
|
Work on Floor(s): 006
|
| 03/06/2006 |
104370075 |
01 |
A2 |
X SIGNED OFF |
10/19/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR APARTMENT #6A. ERECT PARTITIONS, INSTALL PLUMBING
|
|
Work on Floor(s): 002
|
| 02/21/2006 |
104359169 |
01 |
A3 |
X SIGNED OFF |
02/23/2009 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED 25 FT LONG AT 171 MULBERRY STREET. DURING
|
|
Work on Floor(s): 001
|
| 09/09/2005 |
104234259 |
01 |
A2 |
X SIGNED OFF |
10/21/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR APARTMENT #2b. NO CHANGE IN USE, EGRESS OR OCCUPA
|
|
Work on Floor(s): 002
|
| 05/06/2005 |
104112675 |
01 |
A2 |
X SIGNED OFF |
10/21/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR APARTMENT #4B, NO CHANGE IN USE, EGRESS OR OCCUPAN
|
|
Work on Floor(s): 004
|
| 12/21/2004 |
103991735 |
01 |
A2 |
Q PERMIT-PARTIAL |
12/29/2004 |
0013529 RA |
KATZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/10/2016 INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE I
|
|
Work on Floor(s): 1
|
| 11/26/2004 |
103980505 |
01 |
A2 |
X SIGNED OFF |
10/21/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR APARTMENT #5A. NO CHANGE IN USE, EGRESS OR OCCUPA
|
|
Work on Floor(s): 005
|
| 07/21/2004 |
103800647 |
01 |
PA |
U COMPLETED |
08/30/2017 |
0023225 RA |
WAINER |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 06/11/2004 |
103806419 |
01 |
A1 |
R PERMIT-ENTIRE |
01/19/2017 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS FOR A NEW RESTAURANT AT THE FIRST FLOOR.
|
|
Work on Floor(s): CEL,001
|
| 04/20/2004 |
103769030 |
01 |
A2 |
X SIGNED OFF |
03/14/2023 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
RENOVATION OF THE EXISTING CELLAR TOILET ROOMS TO MODIFY THE NUMBER OF TOI
|
|
Work on Floor(s): CE1,001,002
|
| 06/05/2003 |
103476686 |
01 |
A2 |
X SIGNED OFF |
09/25/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
ENTERIOR RENOVATION FOR APARTMENT 2A AND 3A AT SECOND AND THIRD FLOOR ONLY
|
|
Work on Floor(s): 002,003
|
| 05/06/2002 |
103153962 |
01 |
A2 |
X SIGNED OFF |
09/13/2022 |
0043754 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
On a first story storefront, replace two windows and one door with two set
|
|
Work on Floor(s): 001
|
| 05/08/1998 |
101810514 |
01 |
A2 |
X SIGNED OFF |
12/14/1998 |
0012884 RA |
TOY |
|
NOT APPLICABLE
|
|
RELOCATE BATH & TOILET, INTERIOR PARTITIONS & REPLACE WINDOWS WITHIN APT.
|
|
Work on Floor(s): 1
|
| 10/16/1997 |
101824929 |
01 |
A2 |
P APPROVED |
10/21/1997 |
0599271 PE |
Melamud |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/08/2021 Installing sink and water lines for steam table,
|
|
Work on Floor(s): 001
|