| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/19/2016 |
140460837 |
01 |
A2 |
D A/P ENTIRE |
02/19/2016 |
0091112 PE |
SCHWARTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/19/2016 INSTALL NEW SPRINKLER AND STANDPIPE SYSTEM IN CON
|
|
Work on Floor(s): CEL,ROF 001 thru 008
|
| 08/12/2008 |
110309782 |
01 |
A3 |
X SIGNED OFF |
09/22/2009 |
0029017 RA |
CHRISTOP |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDDUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 07/21/2008 |
110294191 |
01 |
A3 |
R PERMIT-ENTIRE |
08/20/2008 |
0028575 RA |
SHEKONI |
|
NOT APPLICABLE
|
|
PROPOSE REPAIR EXISTING FRONT BUILDING FACADE AS PER PLAN. SIDEWALK SHED
|
|
Work on Floor(s): ROF 001 thru 005
|
| 01/15/2008 |
110070235 |
01 |
A2 |
R PERMIT-ENTIRE |
04/02/2008 |
0023916 RA |
INTILI |
|
NOT APPLICABLE
|
|
MINOR INTERIOR PARTITION CHANGES WITH GENERAL CONSTRUCTION AS PER PLAN. TH
|
|
Work on Floor(s): CEL
|
| 10/24/2006 |
104586663 |
01 |
A1 |
J P/E DISAPPROVED |
11/02/2006 |
0049789 PE |
HINKLEY |
|
NOT APPLICABLE
|
|
CHANGE OF OCCUPANCY AT THE CELLAR FROM OFFICES TO STORE "BSA APPROVAL
|
|
Work on Floor(s): CEL
|
| 08/23/2005 |
104204308 |
01 |
A2 |
X SIGNED OFF |
03/13/2006 |
0049789 PE |
HINKLEY |
|
NOT APPLICABLE
|
|
COMBINE APARTMENTS WITH GENERAL CONSTRUCTION, PLUMBING, MECHANICAL AND STO
|
|
Work on Floor(s): CEL 001 thru 005
|
| 02/14/2005 |
103192536 |
04 |
A2 |
D A/P ENTIRE |
02/15/2005 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/16/2006
|
|
Work on Floor(s): 001,CEL
|
| 08/26/2004 |
103912232 |
01 |
A2 |
X SIGNED OFF |
06/17/2005 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
Remove old stoup & create new exist accessory stair to cellar. No change i
|
|
Work on Floor(s): CEL
|
| 05/12/2004 |
103778431 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/14/2004 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 Apartment combination at first floor front for ne
|
|
Work on Floor(s): 001 thru 005
|
| 10/14/2003 |
103586246 |
01 |
A2 |
Q PERMIT-PARTIAL |
10/31/2003 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 General construction to include new partitions &
|
|
Work on Floor(s): 004
|
| 08/06/2003 |
103192536 |
03 |
A2 |
D A/P ENTIRE |
08/08/2003 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/16/2006
|
|
Work on Floor(s): 001,CEL
|
| 08/01/2003 |
103529978 |
01 |
A2 |
J P/E DISAPPROVED |
08/05/2003 |
0026272 RA |
Ishac |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/21/2006 Install new fire suppression system, no change in
|
|
Work on Floor(s): BAS
|
| 08/01/2003 |
103529969 |
01 |
A2 |
P APPROVED |
08/25/2003 |
0026272 RA |
Ishac |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/07/2006 Convert existing offices UG#6 into an eating and
|
|
Work on Floor(s): BAS
|
| 05/19/2003 |
103461013 |
01 |
A2 |
Q PERMIT-PARTIAL |
02/24/2004 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 General Construction to include new partitions &
|
|
Work on Floor(s): 005
|
| 05/19/2003 |
103459277 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/22/2003 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 General Construction to include new partitions &
|
|
Work on Floor(s): 002
|
| 11/07/2002 |
103193385 |
02 |
A2 |
L P/E PAA $ PENDIN |
11/26/2002 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/16/2006
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 11/07/2002 |
103192536 |
02 |
A2 |
M P/E PAA $ RESOLV |
11/26/2002 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/16/2006
|
|
Work on Floor(s): 001,CEL
|
| 07/02/2002 |
103193385 |
01 |
A2 |
R PERMIT-ENTIRE |
12/09/2002 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 General construction to include new partitions, H
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 07/01/2002 |
103200590 |
01 |
A2 |
Q PERMIT-PARTIAL |
03/05/2003 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 General construction to include new partition, HV
|
|
Work on Floor(s): ROF,005
|
| 06/28/2002 |
103192536 |
01 |
A2 |
Q PERMIT-PARTIAL |
03/17/2005 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2006 General construction to include apartment combina
|
|
Work on Floor(s): 001,CEL
|
| 01/08/2001 |
102930946 |
01 |
A2 |
X SIGNED OFF |
06/26/2001 |
0012261 RA |
HIRSCH |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
|
|
Work on Floor(s): CEL
|
| 06/11/1993 |
100643001 |
01 |
A2 |
P APPROVED |
06/17/1993 |
0018553 RA |
YOON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/03/2006 TO CONSTRUCT METAL ENCLOSURES AT THE EAS T AND WE
|
|
Work on Floor(s): STR,LEV
|
| 10/17/1990 |
100126542 |
01 |
A3 |
R PERMIT-ENTIRE |
04/24/1991 |
0014691 RA |
STUTZ |
|
NOT APPLICABLE
|
|
REMOVE EXISTING ENCLOSURES AT STREET LEVEL IN RESPONSE TO VIOLATION
|
|
Work on Floor(s): LEV
|