 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/07/2023 |
140477017 |
02 |
A3 |
P APPROVED |
03/08/2023 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/07/2023 |
100325211 |
02 |
A2 |
P APPROVED |
03/07/2023 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|
| 10/14/2022 |
121114524 |
11 |
A2 |
P APPROVED |
11/14/2022 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01 ADD NEW REAR EXTENSION AT CELLAR AND FIRST
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 10/04/2022 |
121114524 |
10 |
A2 |
P APPROVED |
10/09/2022 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 08/22/2021 |
121114524 |
09 |
A2 |
P APPROVED |
06/16/2022 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/28/2020 |
121114524 |
08 |
A2 |
P APPROVED |
05/12/2020 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01 ADD NEW REAR EXTENSION AT CELLAR AND FIRST
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 10/07/2019 |
121114524 |
07 |
A2 |
P APPROVED |
10/11/2019 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01 ADD NEW REAR EXTENSION AT CELLAR AND FIRST
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/12/2019 |
121114524 |
06 |
A2 |
P APPROVED |
04/25/2019 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 01/24/2017 |
121114524 |
05 |
A2 |
P APPROVED |
03/24/2017 |
|
LING |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 03/30/2016 |
140477017 |
01 |
A3 |
X SIGNED OFF |
03/09/2023 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 05/05/2015 |
121989321 |
02 |
A2 |
P APPROVED |
06/04/2015 |
|
PARNASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 02/25/2015 |
121114524 |
04 |
A2 |
P APPROVED |
10/31/2016 |
|
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/25/2014 |
121989321 |
01 |
A2 |
X SIGNED OFF |
07/23/2015 |
0027497 RA |
PARNASS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AS PER PLANS FILED HER
|
|
Work on Floor(s): 001
|
| 11/19/2013 |
121114524 |
03 |
A2 |
X SIGNED OFF |
11/16/2022 |
0026466 RA |
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
ADD NEW REAR EXTENSION AT CELLAR AND FIRST THROUGH FIFTH FLOORS.REPLACE
|
|
Work on Floor(s): CEL,ROF,1-5
|
| 10/24/2012 |
121156872 |
02 |
A2 |
P APPROVED |
11/29/2012 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 08/07/2012 |
121156872 |
01 |
A2 |
X SIGNED OFF |
07/25/2013 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APARTMENT #4 ON THE THIRD FLOOR. NO CHANGE TO USE, EGRESS, OR OCCU
|
|
Work on Floor(s): 003
|
| 06/26/2012 |
121114524 |
02 |
A2 |
X SIGNED OFF |
11/16/2022 |
0061752 PE |
LING |
|
GRANTED 08/29/2013
|
|
STRUCTURAL PLANS BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 06/26/2012 |
121114524 |
01 |
A2 |
X SIGNED OFF |
11/16/2022 |
0026466 RA |
ROTHSTEI |
|
GRANTED 08/29/2013
|
|
ADD NEW REAR EXTENSION AT CELLAR AND FIRST THROUGH FIFTH. REMODEL APT 1 &
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/02/2012 |
120689246 |
02 |
A2 |
D A/P ENTIRE |
04/24/2012 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/21/2022 REMODEL APARTMENT 1 ON THE SECOND FLOOR. ADD EXTE
|
|
Work on Floor(s): 001 thru 005
|
| 05/12/2011 |
120689246 |
01 |
A2 |
Q PERMIT-PARTIAL |
02/16/2012 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/21/2022 REMODEL APARTMENT 1 ON SECOND FLOOR. NO CHANGE T
|
|
Work on Floor(s): 002
|
| 03/01/2010 |
120281079 |
01 |
A3 |
X SIGNED OFF |
08/16/2012 |
0029017 RA |
CHRISTOP |
|
NOT APPLICABLE
|
|
REPLACEMENT OF STUCCO AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS U
|
|
Work on Floor(s): 005
|
| 02/09/2010 |
120263357 |
01 |
A3 |
X SIGNED OFF |
05/23/2012 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 01/22/2008 |
110077229 |
01 |
A2 |
Q PERMIT-PARTIAL |
02/29/2008 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/21/2022 Remodel Apt #6 on the 4th floor. No change to use
|
|
Work on Floor(s): 004
|
| 12/07/2004 |
103985966 |
01 |
A2 |
P APPROVED |
12/08/2004 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/06/2023 INSTALLATION OF NEW OIL BOILER AND GAS HOT WATER
|
|
Work on Floor(s): CEL
|
| 11/16/2004 |
103973746 |
01 |
A2 |
R PERMIT-ENTIRE |
02/23/2005 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 12/21/2022 PARTITION AND PLUMBING WORK IN EXISTING APARTMENT.
|
|
Work on Floor(s): 005,ROF 005 thru 005
|
| 10/04/2004 |
103935510 |
01 |
A2 |
R PERMIT-ENTIRE |
10/22/2004 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 12/21/2022 PARTITION AND PLUMBING WORK IN EXISTING APARTMENT.
|
|
Work on Floor(s): ROF 005 thru 005
|
| 08/14/2001 |
102977361 |
01 |
A2 |
R PERMIT-ENTIRE |
08/21/2001 |
0013529 RA |
Katz |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/06/2023 REFURBISH APARTMENT # 2; PAINT AND PLASTER TO MAT
|
|
Work on Floor(s): 002
|
| 04/03/1996 |
101279938 |
01 |
A2 |
R PERMIT-ENTIRE |
04/12/1996 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER & OIL BURNER. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDE
|
|
Work on Floor(s): CEL
|
| 09/16/1991 |
100325211 |
01 |
A2 |
X SIGNED OFF |
03/10/2023 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMOVE EXISTING STOREFRONT AND INSTALL NEW STOREFRONT.
|
|
Work on Floor(s): 1
|