 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/17/2019 |
123751617 |
01 |
A2 |
X SIGNED OFF |
08/28/2019 |
0092809 PE |
KAVI |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR APARTMENT INTERIOR RENOVATION, REPLACE BATHROOM 3 FI
|
|
Work on Floor(s): 001
|
| 05/31/2019 |
140851790 |
01 |
A2 |
H P/E IN PROCESS |
05/31/2019 |
0092809 PE |
KAVI |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 07/30/2019 APPLICATION FILED FOR APARTMENT INTERIOR RENOVATIO
|
|
Work on Floor(s): 001
|
| 10/14/2014 |
122121523 |
01 |
A1 |
X SIGNED OFF |
10/22/2015 |
0022841 RA |
JIMENEZ |
|
NOT APPLICABLE
|
|
THIS ALTERATION TYPE I APPLICATION IS BEING FILED FOR MINOR CONSTRUCTION &
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 09/26/2014 |
122106112 |
01 |
A2 |
X SIGNED OFF |
04/30/2015 |
0043105 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
236/14-PROPERLY FILE BOILER INSTALLED PER 100831655. THIS APPLICATION
|
|
Work on Floor(s): CEL
|
| 05/14/2014 |
122008647 |
01 |
A3 |
X SIGNED OFF |
02/02/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. ALL WORK
|
|
Work on Floor(s): OSP
|
| 05/14/2014 |
122008665 |
01 |
A3 |
X SIGNED OFF |
04/22/2015 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|