| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/19/2023 |
103009049 |
03 |
A1 |
D A/P ENTIRE |
10/13/2023 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003 thru 005
|
| 12/09/2022 |
123672631 |
03 |
A2 |
P APPROVED |
06/02/2023 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 06/24/2020 |
123672631 |
02 |
A2 |
P APPROVED |
11/03/2021 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 04/26/2019 |
123672631 |
01 |
A2 |
X SIGNED OFF |
07/18/2023 |
0029876 RA |
PRAINITO |
|
NOT APPLICABLE
|
|
INTRIOR RENOVATION OF 5TH FLOOR , PARTITIONS AND PLUMBING WORK. ALL AS PER
|
|
Work on Floor(s): 005
|
| 11/02/2017 |
120560080 |
02 |
A2 |
D A/P ENTIRE |
03/15/2018 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,005
|
| 11/02/2017 |
101889690 |
02 |
A2 |
D A/P ENTIRE |
03/15/2018 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 11/02/2017 |
103009049 |
02 |
A1 |
D A/P ENTIRE |
03/15/2018 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/12/2023 CHANGE OF USE OF THIRD, FOURTH AND FIFTH FLOORS F
|
|
Work on Floor(s): 003 thru 005
|
| 11/02/2017 |
120512454 |
04 |
A2 |
D A/P ENTIRE |
03/15/2018 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/02/2017 |
120693856 |
02 |
A2 |
D A/P ENTIRE |
03/15/2018 |
|
PRAINITO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005,ROF
|
| 08/22/2017 |
140682143 |
01 |
A3 |
X SIGNED OFF |
07/20/2018 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, E
|
|
Work on Floor(s): OSP
|
| 05/26/2017 |
122554985 |
01 |
A2 |
X SIGNED OFF |
05/09/2018 |
0074142 PE |
GURBALL |
|
NOT APPLICABLE
|
|
REPLACE EXISTING STORE FRONT AT FIRST AND SECOND FLOORS NO CHANGE IN USE
|
|
Work on Floor(s): 1ST,2ND
|
| 07/05/2013 |
121706047 |
01 |
A2 |
X SIGNED OFF |
05/29/2015 |
0086301 PE |
ZHAO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR 4TH FLOOR APPARTMENT, INCULDING PLUMBING FIXTURES
|
|
Work on Floor(s): 004,ROF
|
| 08/10/2012 |
120512454 |
03 |
A2 |
P APPROVED |
08/16/2012 |
|
RYCAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/07/2011 |
120512454 |
02 |
A2 |
P APPROVED |
09/14/2011 |
|
RYCAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/17/2011 |
120693856 |
01 |
A2 |
R PERMIT-ENTIRE |
09/26/2011 |
0029876 RA |
PRAINITO |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUCTLESS AC UNIT @005 FLOOR FRONT. PROVISION OF ONE SOLEUS
|
|
Work on Floor(s): 005,ROF
|
| 04/14/2011 |
120596747 |
02 |
A2 |
P APPROVED |
04/14/2011 |
|
RYCAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 02/03/2011 |
120596747 |
01 |
A2 |
X SIGNED OFF |
05/13/2013 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
INSTALATION OF NEW RISERS FROM CELLAR THRU FIFTH FLOOR. ALL AS PER PANS AN
|
|
Work on Floor(s): CEL 001 thru 005
|
| 12/16/2010 |
120560080 |
01 |
A2 |
R PERMIT-ENTIRE |
12/23/2010 |
0029876 RA |
PRAINITO |
|
NOT APPLICABLE
|
|
WINDOWS REPLACEMENT @004 AND 005 FLOORS. ALL AS PER PLANS AND APPLICATIONS
|
|
Work on Floor(s): 004,005
|
| 12/14/2010 |
120558191 |
01 |
A2 |
X SIGNED OFF |
11/07/2011 |
0043595 PE |
REILLY |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW SPRINKLERS HEADS CONNECTED TO EXISTING SPRINKLERS SYST
|
|
Work on Floor(s): CEL,003,004,005
|
| 10/26/2010 |
120512454 |
01 |
A2 |
R PERMIT-ENTIRE |
12/13/2012 |
0029876 RA |
PRAINITO |
|
NOT APPLICABLE
|
|
LEGALIZE EXISTING COMMERCIAL LOW PRESSURE GAS FIRED STEAM BOILER. ALL AS P
|
|
Work on Floor(s): CEL
|
| 10/26/2010 |
120513300 |
01 |
A2 |
X SIGNED OFF |
10/17/2013 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEAM SOURCE HOT WATER HEATER,INSTALLATION OF NEW HOT AND
|
|
Work on Floor(s): CEL 001 thru 005
|
| 07/22/2010 |
120422426 |
01 |
A3 |
X SIGNED OFF |
10/03/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 36 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 10/03/2006 |
104565720 |
01 |
A3 |
R PERMIT-ENTIRE |
10/03/2006 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 20 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 05/25/2006 |
104444790 |
01 |
A2 |
X SIGNED OFF |
07/24/2008 |
0072803 PE |
Wong |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATION OF AN EXISTING OFFICE SPACE WITH PLUMBING WORK.
|
|
Work on Floor(s): 002
|
| 10/17/2001 |
103009049 |
01 |
A1 |
R PERMIT-ENTIRE |
11/01/2022 |
0029876 RA |
PRAINITO |
|
NOT APPLICABLE
|
|
CHANGE OF USE OF THIRD, FOURTH AND FIFTH FLOORS FROM COMMERCIAL TO RESI
|
|
Work on Floor(s): 003 thru 005
|
| 07/07/1998 |
101889690 |
01 |
A2 |
R PERMIT-ENTIRE |
12/02/2005 |
0029876 RA |
PRAINITO |
|
NOT APPLICABLE
|
|
INSTALLATION OF WASHER AND DRYER ALL AS PER PLANS AND APPLICATIONS FILED
|
|
Work on Floor(s): 005
|