 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/28/2008 |
104793207 |
02 |
A2 |
P APPROVED |
05/16/2008 |
|
SCHWARZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/05/2007 |
104793207 |
01 |
A2 |
R PERMIT-ENTIRE |
12/14/2011 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
INSTALL 3 HOT WATER HEATERS (H TYPE) BOILER WORK TYPE. REMOVE 3 BOILERS. N
|
|
Work on Floor(s): CEL
|
| 01/17/2007 |
104641176 |
01 |
A3 |
R PERMIT-ENTIRE |
01/29/2007 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 25' DURING FACADE REPAIR. NO CHAN
|
|
Work on Floor(s): 001
|
| 12/08/2006 |
104622179 |
01 |
A2 |
X SIGNED OFF |
01/15/2008 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
REPAIR FACADE AND INSTALL NEW BRICK AND STONE FACING. REPLACE WINDOWS, WIN
|
|
Work on Floor(s): ROF 001 thru 004
|
| 08/09/2002 |
103194231 |
02 |
A2 |
P APPROVED |
08/28/2002 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/26/2002 |
103194231 |
01 |
A2 |
Q PERMIT-PARTIAL |
10/18/2002 |
0012875 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
1 GAS FILED CHILLER, 1 GAS FILED STEAM BOILER, 1 GAS FILED WATER BOILER,,
|
|
Work on Floor(s): CEL
|
| 07/03/2001 |
102519419 |
01 |
A2 |
R PERMIT-ENTIRE |
08/10/2001 |
0053541 PE |
Hahn |
|
NOT APPLICABLE
|
|
Install gas fired boilers and burner, as shown on plan.
|
|
Work on Floor(s): CEL
|
| 03/07/1991 |
100236978 |
01 |
A2 |
Q PERMIT-PARTIAL |
04/04/1991 |
0008178 RA |
BARTON |
|
NOT APPLICABLE
|
|
INSTALL DRY CHEMICAL SYSTEM AT FIRST FLOOR RANGE HOOD AND GAS VALVE
|
|
Work on Floor(s): 1
|
| 10/22/1990 |
100130662 |
01 |
A3 |
X SIGNED OFF |
12/27/1990 |
0031126 PE |
DUBIN |
|
NOT APPLICABLE
|
|
REPAIR AND REPOINT MASONRY WALL & FOUND. NO CHANGE OF USE, EGRESS OR
|
|
Work on Floor(s): CLR,BAS
|