| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/04/2017 |
123303558 |
02 |
A2 |
P APPROVED |
12/07/2017 |
|
PORTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,005
|
| 10/06/2017 |
123161087 |
01 |
A3 |
R PERMIT-ENTIRE |
10/19/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. ALL WORK
|
|
Work on Floor(s): OSP
|
| 07/31/2017 |
123303558 |
01 |
A2 |
X SIGNED OFF |
07/03/2018 |
0055629 PE |
PORTER |
|
NOT APPLICABLE
|
|
APPILCATION FILED FOR INTERIOR RENOVATION, NEW POWDER ROOM & MASTER CLOSET
|
|
Work on Floor(s): 001,005
|
| 08/14/2013 |
121749313 |
01 |
A3 |
X SIGNED OFF |
10/06/2014 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): SHE
|
| 08/08/2013 |
121744292 |
01 |
A3 |
X SIGNED OFF |
10/03/2014 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE,EG
|
|
Work on Floor(s): GRD
|
| 02/20/1998 |
101747567 |
01 |
A2 |
X SIGNED OFF |
05/04/1999 |
0016844 RA |
BARTA |
|
NOT APPLICABLE
|
|
PROPOSE TO ALTER FIRST, SECOND, THIRD AND FOURTH FLOORS AS INDICATED
|
|
Work on Floor(s): ROF 001 thru 004
|