BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 218 EAST 3 STREET MANHATTAN BIN: 1004590    Block: 385    Lot: 14

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
12/15/2011 120258808 06 A1 P APPROVED 12/21/2011 JACOBS GRANTED 09/16/2010
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,001,008

07/15/2011 120258808 05 A1 P APPROVED 07/18/2011 JACOBS GRANTED 09/16/2010
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,001,008

04/21/2011 120258808 04 A1 P APPROVED 04/27/2011 JACOBS GRANTED 09/16/2010
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,001,008

01/18/2011 120258808 03 A1 P APPROVED 01/25/2011 JACOBS GRANTED 09/16/2010
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,001,008

12/10/2010 120555363 01 A3 X SIGNED OFF 12/27/2011 0071719 PE UDDIN NOT APPLICABLE
 INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION FILED
 Work on Floor(s): OSP

12/08/2010 120543929 01 A2 X SIGNED OFF 08/26/2011 0077765 PE HOWELL NOT APPLICABLE
 SPRINKLER SYSTEM IN CONJUNCTION WITH APPLICATION 120258808
 Work on Floor(s): 008

02/08/2010 120258808 02 A1 X SIGNED OFF 12/27/2011 0063244 PE GIBBLE GRANTED 09/16/2010
 STRUCTURAL WORK
 Work on Floor(s): 00C,001,002

02/08/2010 120258808 01 A1 X SIGNED OFF 12/27/2011 0009723 RA JACOBS GRANTED 09/16/2010
 HORIZONTAL ENLARGEMENT AT 8TH FLOOR AND INTERIOR ALTERATIONS AT CELLAR AND
 Work on Floor(s): CEL,001,008

07/09/2003 102348158 06 NB P APPROVED 07/24/2003 0059630 PE VELDSTEY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): GRD

06/12/2003 102348158 05 NB P APPROVED 07/01/2003 0009723 RA JACOBS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): GRD

02/13/2003 103391072 01 A2 X SIGNED OFF 08/18/2003 0059630 PE VELDSHTE NOT APPLICABLE
 WE ARE FILING A NEW BOILER APPLICATION I N CONJUNCTION WITH NEW
 Work on Floor(s): CEL

01/09/2003 103347166 01 A3 X SIGNED OFF 08/19/2003 0065635 PE Cheung NOT APPLICABLE
 Installation of 100' long X 70' high pipe scaffold in conjunction with new
 Work on Floor(s): 001

07/19/2002 103211294 01 A3 X SIGNED OFF 08/20/2003 0065636 PE Cheung NOT APPLICABLE
 INSTALLATION OF SIDEWALK BRIDGE IN CONJUNCTION WITH NEW BUILDING # 1023481
 Work on Floor(s): 001

03/28/2002 103125413 01 A3 P APPROVED 06/27/2002 0009723 PE JACOBS NOT APPLICABLE
 WE ARE HEREWITH THE FIRE PROTECTION PLAN FOR A NEW 8 STORY BUILDING WITH
 Work on Floor(s): CEL 001 thru 008

01/17/2002 103073264 01 A2 X SIGNED OFF 08/20/2003 0029007 PE HERTZBER NOT APPLICABLE
 UNDERPINNING FOR THE NEW BUILDING APPLICATION PERMITTED UNDER
 Work on Floor(s): CEL

01/09/2002 103070640 01 A2 X SIGNED OFF 08/08/2011 0059630 PE VELDSHTE NOT APPLICABLE
 INSTALLATION OF A FIRE ALARM SYSTEM FILED INCONJUCTION WITH A NEW
 Work on Floor(s): CEL 001 thru 008

01/08/2002 102348158 04 NB P APPROVED 01/11/2002 0009723 RA JACOBS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): GRD

09/04/2001 102349344 01 A2 X SIGNED OFF 08/19/2003 0059630 PE VELDSHTE NOT APPLICABLE
 WE ARE FILING FOR SPRINKLER SYSTEM FOR AN 8 STORY NEW BUILDING WITH A
 Work on Floor(s): CEL 001 thru 008

09/04/2001 102349335 01 A2 X SIGNED OFF 08/19/2003 0059630 PE VELDSHTE NOT APPLICABLE
 WE ARE FILING FOR STANDPIPE SYSSTEM FOR AN 8 STORY NEW BUILDING WITH A
 Work on Floor(s): CEL 001 thru 008

08/31/2001 102349353 01 A3 R PERMIT-ENTIRE 12/17/2001 0009723 RA JACOBS NOT APPLICABLE
 WE ARE FILING A BUILDING PAVING PLAN IN CONJUNCTION WITH NEW BUILDING AP
 Work on Floor(s): CEL 001 thru 008

08/30/2001 102348158 01 NB X SIGNED OFF 01/27/2004 0009723 RA JACOBS NOT APPLICABLE
 Work on Floor(s): GRD

08/30/2001 102348158 03 NB X SIGNED OFF 01/27/2004 0059630 PE VELDSTEY NOT APPLICABLE
 WE ARE FILING MECHANICAL AND PLUMBING PLANS FOR NEW 8 STORY BUILDING
 Work on Floor(s): GRD

08/30/2001 102348158 02 NB X SIGNED OFF 01/27/2004 0033925 PE GOLDSTEI NOT APPLICABLE
 WE ARE FILING STRUCTURAL PLANS FOR A NEW 8 STORY PLUS CELLAR BUILDING.
 Work on Floor(s): GRD

07/23/2001 102586284 01 DM X SIGNED OFF 02/11/2002 11801 CAREW NOT APPLICABLE
 Work on Floor(s): 001 thru 003

05/03/1996 101300619 01 A2 P APPROVED 05/07/1996 0012021 RA HO NOT APPLICABLE
 JOB WITHDRAWN 08/04/2011 TO CHANGE THE NATURE OF BUSINESS FROM TR UCKING T
 Work on Floor(s): 001



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications