 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 11/01/2017 |
122595806 |
PR |
E LAA FILED |
11/13/2017 |
FSC 001051 |
SULGER |
|
IN THE CELLAR AND ROOF RELOCATE (2) 4" RISER CONTROL VALVES ONE PER EACH F
|
|
Work on Floor(s): CEL,ROF
|
| 11/01/2017 |
122595799 |
PR |
E LAA FILED |
11/13/2017 |
FSC 001051 |
SULGER |
|
ON THE FIRST FLOOR VESTIBULE REARRANGE (1) SPRINKLER HEAD USING APPROX. 10
|
|
Work on Floor(s): 001
|
| 10/16/2017 |
140707518 |
PR |
E LAA FILED |
10/16/2017 |
FSC 001051 |
SULGER |
|
REARRANGE ONE SPRINKLER HEAD IN FIRST FLOOR VESTIBULE RELOCATE RISER CONT
|
|
Work on Floor(s): CEL,1ST,2ND,3RD,4TH,5TH 001 thru 002 003 thru 007
|