BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B423918
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 801 PARK PLACE BROOKLYN BIN: 3330794     Block: 1233   Lot: 26
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 760 PROSPECT PL Census Tract:   317.01 Health Area:  2900
1-4 Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11216 Community Board:   308
Special Place Name:   PS 138
DOB Cross Street(s):   ROGERS AVENUE,    NOSTRAND AVENUE
Status:   C - JOB IS SIGNED OFF 05/20/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/10/2017 5:21 PM
Application Entered:   02/10/2017 Job Start Date:   02/11/2017
Last Change:   05/20/2017 Job End Date:   02/11/2018
Appointment Status:   
Last Inspection By:   CAMPBELL, C       On     05/15/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012111 Licensee Name: MICHAEL NAVARRETE
Firm: 003732 Firm Name: SKYLINE ELEC'L CONTRACT
Firm Phone: 718-803-2223  Firm Address: 4101 48TH STREET LONG ISLAND CITY NY 11104 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $48.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   W - School
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: BD OF ED BD OF ED
Owner Business Name: PS 138
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
MZ1    42                     
Buildings Total 42                        
Total Units : 42 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  REPAIR AND INSTALL OF EXIT SIGNS

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: B423918
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/27/2017 03/09/2017 ADM N (20) (0) Y
INSPECTION COMMENTS: NO SHOW
 
(2) 04/03/2017 04/03/2017 DIT N (20) (0) Y
INSPECTION COMMENTS: CALLED CONTRACTOR NO SHOW
 
(3) 05/15/2017 05/17/2017 CLC C (80) (0) Y
INSPECTION COMMENTS: INSPECTION PASS




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back