| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/08/2019 |
123352665 |
06 |
A2 |
P APPROVED |
10/02/2019 |
|
XIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 01/04/2019 |
123195087 |
03 |
A2 |
P APPROVED |
01/15/2019 |
|
XIA |
|
GRANTED 04/19/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005,ROF
|
| 12/17/2018 |
123195087 |
02 |
A2 |
P APPROVED |
12/21/2018 |
|
XIA |
|
GRANTED 04/19/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005,ROF
|
| 10/03/2018 |
123352665 |
05 |
A2 |
P APPROVED |
10/04/2018 |
|
XIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 09/17/2018 |
123352665 |
04 |
A2 |
P APPROVED |
09/19/2018 |
|
XIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 07/03/2018 |
123352665 |
03 |
A2 |
P APPROVED |
07/10/2018 |
|
XIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 03/09/2018 |
123195087 |
01 |
A2 |
X SIGNED OFF |
09/05/2019 |
0093795 PE |
XIA |
|
GRANTED 04/19/2018
|
|
HORIZONTAL ENLARGEMENT AND INTERIOR ALTERATION OF 5TH FLOOR. NO CHANGE IN
|
|
Work on Floor(s): 005,ROF
|
| 02/26/2018 |
123352665 |
02 |
A2 |
P APPROVED |
03/01/2018 |
|
XIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 11/09/2017 |
123161014 |
01 |
A1 |
H P/E IN PROCESS |
11/15/2017 |
0093795 PE |
XIA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/22/2019 HORIZONTAL AND VERTICAL EXTENSION OF EXISTING 5-S
|
|
Work on Floor(s): CEL,BAS,RF 001 thru 005
|
| 08/04/2017 |
123352665 |
01 |
A2 |
X SIGNED OFF |
10/21/2019 |
0093795 PE |
XIA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT CELLAR, BASEMENT, 1ST FLOOR TO 5TH FLOOR OF THE EXI
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 02/08/2017 |
123008681 |
01 |
A2 |
X SIGNED OFF |
05/01/2019 |
0093795 PE |
XIA |
|
NOT APPLICABLE
|
|
REMOVAL OF NON-BEARING WALL, FLOOR AND CEILING FINISH IN BASEMENT. REMOVE
|
|
Work on Floor(s): BAS,CEL,OSP
|
| 11/16/1998 |
101775189 |
04 |
A1 |
P APPROVED |
11/16/1998 |
0010096 RA |
MELTZER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,5
|
| 11/10/1998 |
101775189 |
03 |
A1 |
P APPROVED |
11/10/1998 |
0010096 RA |
MELTZER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,5
|
| 09/21/1998 |
101775189 |
02 |
A1 |
P APPROVED |
10/29/1998 |
0010096 RA |
MELTZER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,5
|
| 02/03/1998 |
101775189 |
01 |
A1 |
X SIGNED OFF |
12/28/1998 |
0010096 RA |
MELTZER |
|
NOT APPLICABLE
|
|
CHANGE OF USE TO BASEMENT, 1ST AND 2ND FLOORS. PROPOSED PENTHOUSE
|
|
Work on Floor(s): BAS,5
|
| 11/10/1997 |
101580843 |
01 |
A3 |
X SIGNED OFF |
11/24/1998 |
|
GALLO |
|
NOT APPLICABLE
|
|
ERECT 24 FT. OF HEAVY DUTY SIDEWALK SHED FOR WORK BEING DONE UNDER
|
|
Work on Floor(s): GRD
|
| 06/27/1997 |
101557673 |
01 |
A2 |
R PERMIT-ENTIRE |
05/13/1998 |
0010096 RA |
MELTZER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/29/1998 RENOVATIONS TO APARTMENTS, REMOVAL AND CONSTRUCTI
|
|
Work on Floor(s): 3, 4
|