 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/26/2012 |
121166772 |
01 |
A2 |
X SIGNED OFF |
09/19/2012 |
0012492 RA |
HAMMERMA |
|
NOT APPLICABLE
|
|
REMOVAL OF PARTITIONS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO
|
|
Work on Floor(s): 004
|
| 03/01/2007 |
104689231 |
01 |
A2 |
R PERMIT-ENTIRE |
10/29/2007 |
0066722 PE |
Huang |
|
NOT APPLICABLE
|
|
Relocate existing HWH, Larrs Endurance to boiler room. Remove illegal
|
|
Work on Floor(s): 006
|
| 10/16/2006 |
104587092 |
01 |
A2 |
X SIGNED OFF |
12/27/2006 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROPOSED EXTERIOR RENOVATION AT 5TH FLOOR APT.#5B ONLY. PARTITON WORK AS P
|
|
Work on Floor(s): 005
|
| 10/16/2006 |
104587083 |
01 |
A2 |
X SIGNED OFF |
12/12/2006 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT FORTH FLOOR APT.#4B ONLY. PARTITION WORK A
|
|
Work on Floor(s): 004
|
| 08/10/2006 |
104489938 |
02 |
A2 |
P APPROVED |
08/14/2006 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 07/13/2006 |
104489938 |
01 |
A2 |
R PERMIT-ENTIRE |
07/24/2006 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO REMOVE ECB VIOLATION# 34490434N FOR 4TH FLOOR, APT.#
|
|
Work on Floor(s): 004
|
| 06/20/2006 |
104468728 |
01 |
A2 |
X SIGNED OFF |
09/14/2006 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT 4TH FLOOR APT.# 4A ONLY. PARTITION WORK AS
|
|
Work on Floor(s): 004
|