 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/17/2012 |
121381272 |
01 |
A3 |
R PERMIT-ENTIRE |
09/19/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 09/17/2012 |
121381281 |
01 |
A3 |
R PERMIT-ENTIRE |
09/21/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIR AS PER PLAN. NO
|
|
Work on Floor(s): OSP
|
| 12/29/2011 |
120936470 |
01 |
A3 |
R PERMIT-ENTIRE |
12/29/2011 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
PROPOSED FRONT FACADE WALL REPOINTING, SCRAPING AND PAINTING THE CORNICE A
|
|
Work on Floor(s): 001 thru 005
|
| 06/29/2006 |
104479084 |
01 |
A2 |
R PERMIT-ENTIRE |
07/03/2006 |
0078958 PE |
COHEN |
|
NOT APPLICABLE
|
|
REPLACE LOW PRESSURE GAS FIRED BOILERAND CONNECT TO EXISTING GAS
|
|
Work on Floor(s): CEL
|