 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/14/2018 |
123401336 |
01 |
A2 |
X SIGNED OFF |
01/16/2019 |
0095159 PE |
KWAN |
|
NOT APPLICABLE
|
|
FILE THIS APPLICATION TO REPLACE GAS PIPING FOR EX.BOILER & HOT WATER HEAT
|
|
Work on Floor(s): CEL 001 thru 005
|
| 08/16/2016 |
122610013 |
03 |
A2 |
P APPROVED |
08/19/2016 |
|
ZENG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 04/12/2016 |
122610013 |
02 |
A2 |
P APPROVED |
04/14/2016 |
|
ZENG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 12/30/2015 |
122610013 |
01 |
A2 |
X SIGNED OFF |
10/20/2016 |
0090318 PE |
ZENG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION WITH INSTALLATION OF NON-LOAD BEARING PARTITION AND
|
|
Work on Floor(s): 004
|
| 04/19/2006 |
104408767 |
01 |
A2 |
R PERMIT-ENTIRE |
04/26/2006 |
0025149 RA |
HO |
|
NOT APPLICABLE
|
|
LEGALIZE WORK COMPLETED WITHOUT A PERMIT IN APT. #9 REPLACE KITCH SINK AN
|
|
Work on Floor(s): 003
|
| 06/26/2001 |
102513120 |
01 |
A2 |
R PERMIT-ENTIRE |
07/19/2001 |
0054064 PE |
CHOY |
|
NOT APPLICABLE
|
|
INSTALL A NEW GAS BOILER H W HEATER AND H W STORAGE TANK IN EXISTING BOI
|
|
Work on Floor(s): CEL
|