 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 03/01/2018 |
140744586 |
PR |
I LAA SIGNED OFF |
07/31/2018 |
FSC 000794 |
LU |
|
AFTER PRE-TESTING THE SPRINKLER FIRE DEPARTMENT CONNECTION(FDC) FOR AN ALR
|
|
Work on Floor(s): CEL,OSP
|
| 06/17/2017 |
140657689 |
PR |
I LAA SIGNED OFF |
09/19/2017 |
FSC 000794 |
LU |
|
RE-ARRANGE (2) EXISTING SPRINKLER HEADS AND INSTALL (5) NEW SPRINKLER HEAD
|
|
Work on Floor(s): CEL
|
| 09/16/2011 |
110557228 |
PR |
I LAA SIGNED OFF |
12/22/2011 |
MP 001667 |
CHEUNG |
|
CONVERT 1 REGULAR WATER CLOSET & 2 URINALS TO 3 BABY WATER CLOSETS._ABOUT
|
|
Work on Floor(s): 002
|
| 08/10/2009 |
110272017 |
PR |
I LAA SIGNED OFF |
09/17/2009 |
FSC 000794 |
LU |
|
RE-ARRANGE 20 EXISTING SPRINKLER HEADS IN 2ND FL OFFICE COMMERCIAL SPACE
|
|
Work on Floor(s): 002
|