| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/08/2020 |
140988402 |
01 |
A2 |
X SIGNED OFF |
10/12/2021 |
0079022 PE |
LEE |
|
NOT APPLICABLE
|
|
UNIT 620, INTERIOR MEDICAL OFFICE RENOVATION WORK TO INCLUDE FLOOR AND WAL
|
|
Work on Floor(s): 006
|
| 12/08/2020 |
140988395 |
01 |
A2 |
H P/E IN PROCESS |
12/08/2020 |
0079022 PE |
LEE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/08/2020 UNIT 620, INTERIOR MEDICAL OFFICE RENOVATION WORK
|
|
Work on Floor(s): 006
|
| 10/14/2020 |
140964936 |
01 |
A2 |
X SIGNED OFF |
01/26/2022 |
0079704 PE |
LIU |
|
NOT APPLICABLE
|
|
UNIT 301, INTERIOR RENOVATION, FLOOR AND WALL FINISH. NO CHANGE IN USE,
|
|
Work on Floor(s): 003
|
| 10/06/2020 |
140961564 |
01 |
A2 |
X SIGNED OFF |
03/03/2021 |
0034892 RA |
KIM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF MEDICAL OFFICE AT 002 FLOOR UNIT 203 AND 205 AS PE
|
|
Work on Floor(s): 002
|
| 10/05/2020 |
123718682 |
02 |
A2 |
D A/P ENTIRE |
10/15/2020 |
|
KAUFMAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/11/2021
|
|
Work on Floor(s): PH2
|
| 05/28/2020 |
123739204 |
01 |
A2 |
X SIGNED OFF |
03/08/2021 |
0058090 PE |
WAI |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING MEDICAL OFFICE. REMOVE AND INSTALL PARTITION WALLS, FINI
|
|
Work on Floor(s): 008
|
| 11/12/2019 |
123743404 |
01 |
A2 |
P APPROVED |
12/30/2019 |
0029749 RA |
CHEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/08/2021 MINOR INTERIOR RENOVATION TO PREVIOUS RENOVATION
|
|
Work on Floor(s): 002
|
| 07/24/2019 |
123085428 |
03 |
A2 |
P APPROVED |
10/04/2019 |
|
LEUNG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 04/12/2019 |
123869144 |
01 |
A3 |
X SIGNED OFF |
05/09/2019 |
0085507 PE |
CHEN |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATION ON SUITE#307, WITH REPAIRING PARTITIONS AS PER P
|
|
Work on Floor(s): 003
|
| 04/03/2019 |
123718682 |
01 |
A2 |
X SIGNED OFF |
01/12/2021 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR RENOVATION OF OUTDOOR TERRACE SPACE AT PENTHOUE LEVEL.,
|
|
Work on Floor(s): PH2
|
| 02/19/2019 |
123085428 |
02 |
A2 |
P APPROVED |
03/14/2019 |
|
LEUNG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 12/05/2018 |
140821332 |
01 |
A2 |
X SIGNED OFF |
08/16/2019 |
0066311 PE |
HONG |
|
NOT APPLICABLE
|
|
REMOVE EXISTING NON-LOAD PARTITION. INSTALL NEW PARTITION AND PLUMBING FIX
|
|
Work on Floor(s): 006
|
| 11/23/2018 |
123431125 |
03 |
A2 |
P APPROVED |
12/24/2018 |
|
LEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 09/25/2018 |
123085428 |
01 |
A2 |
X SIGNED OFF |
05/08/2020 |
0032667 RA |
LEUNG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS: MINOR DEMOLITION, GENERAL CONSTRUCTION, 3-NEW SPRINK
|
|
Work on Floor(s): 006
|
| 04/26/2018 |
123431161 |
01 |
A2 |
X SIGNED OFF |
01/10/2019 |
0085507 PE |
CHEN |
|
NOT APPLICABLE
|
|
INSTALL NEW AC UNIT, RELOCATE EXISTING SPRINKLER HEADS AND REPLACE EXISTIN
|
|
Work on Floor(s): 003
|
| 04/26/2018 |
123431125 |
02 |
A2 |
X SIGNED OFF |
01/31/2019 |
0095159 PE |
KWAN |
|
NOT APPLICABLE
|
|
SUBSEQUENT FILE STRUCTURAL WORK.
|
|
Work on Floor(s): 003
|
| 04/26/2018 |
123431125 |
01 |
A2 |
X SIGNED OFF |
01/31/2019 |
0036613 RA |
LEE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING OFFICE IN 3RD FLOOR SUITE 307, INSTALL NEW
|
|
Work on Floor(s): 003
|
| 04/26/2018 |
123431152 |
01 |
A2 |
J P/E DISAPPROVED |
10/03/2019 |
0085507 PE |
CHEN |
|
NOT APPLICABLE
|
|
RELOCATE THREE FIRE ALARM DEVICES IN EXISTING CLASS E SYSTEM PER PLAN,
|
|
Work on Floor(s): 003
|
| 03/24/2017 |
122657142 |
05 |
A2 |
P APPROVED |
05/11/2017 |
|
MONTAGUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001
|
| 02/21/2017 |
122657142 |
04 |
A2 |
P APPROVED |
02/23/2017 |
|
MONTAGUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 001
|
| 02/07/2017 |
140603041 |
01 |
A2 |
X SIGNED OFF |
05/19/2017 |
0035356 RA |
LI |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT PARTIAL 8TH FLOOR (UNIT # PH116 ONLY). INS
|
|
Work on Floor(s): 008
|
| 06/21/2016 |
122807132 |
01 |
A2 |
X SIGNED OFF |
06/09/2017 |
0082508 PE |
MONTAGUE |
|
NOT APPLICABLE
|
|
FILING TO MODIFY EXISTING FIRE ALARM SYSTEM AS PER PLANS SUBMITTED
|
|
Work on Floor(s): 001
|
| 01/12/2016 |
122657142 |
03 |
A2 |
X SIGNED OFF |
05/24/2017 |
0082508 PE |
MONTAGUE |
|
NOT APPLICABLE
|
|
FILING SPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN U
|
|
Work on Floor(s): 001
|
| 01/12/2016 |
122657142 |
02 |
A2 |
X SIGNED OFF |
05/24/2017 |
0082508 PE |
MONTAGUE |
|
NOT APPLICABLE
|
|
FILING MECHANICAL AND PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): 001
|
| 01/12/2016 |
122657142 |
01 |
A2 |
X SIGNED OFF |
05/24/2017 |
0020424 RA |
IONESCU |
|
NOT APPLICABLE
|
|
FILING TO INSTALL PARTITION AND FINISHES AS PER PLANS FILED HEREWITH. NO
|
|
Work on Floor(s): 001
|
| 05/22/2015 |
122411719 |
01 |
A2 |
X SIGNED OFF |
03/07/2016 |
0088589 PE |
OH |
|
NOT APPLICABLE
|
|
EXISTING OFFICE TO BE RENOVATED -INSTALLATION OF PLUMBING FIXTURES.
|
|
Work on Floor(s): 002
|
| 04/08/2015 |
121907204 |
02 |
A2 |
P APPROVED |
05/15/2015 |
|
CHIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 007
|
| 09/22/2014 |
122139471 |
01 |
A2 |
P APPROVED |
11/06/2014 |
0013891 RA |
CHIN |
|
NOT APPLICABLE
|
|
FILE THIS APPLICATION TO INTERIOR RENOVATION ON 1ST FLOOR FOR UNIT#106; FO
|
|
Work on Floor(s): 001
|
| 08/19/2014 |
121547629 |
05 |
A2 |
P APPROVED |
09/09/2014 |
|
HU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 07/25/2014 |
122071710 |
01 |
A2 |
X SIGNED OFF |
04/21/2015 |
0034693 RA |
CHIN |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION INCLUSIVE OF INSTALLATION OF INTERIOR PARTITIONS,
|
|
Work on Floor(s): 002
|
| 07/24/2014 |
121956080 |
02 |
A2 |
P APPROVED |
09/10/2014 |
|
MAI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 07/17/2014 |
121547629 |
04 |
A2 |
P APPROVED |
08/11/2014 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001
|
| 06/05/2014 |
140199862 |
01 |
A2 |
X SIGNED OFF |
04/15/2015 |
0030200 RA |
GEARY |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING COMMERCIAL SPACE, NO CHANGE TO EXISTING USE, EGRESS
|
|
Work on Floor(s): 005
|
| 05/22/2014 |
121636569 |
02 |
A2 |
P APPROVED |
06/09/2014 |
|
CHAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 05/21/2014 |
121674205 |
02 |
A2 |
P APPROVED |
09/18/2014 |
|
CHAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PH1
|
| 04/04/2014 |
121956080 |
01 |
A2 |
X SIGNED OFF |
01/06/2015 |
0033590 RA |
MAI |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION INCLUSIVE OF INSTALLATION OF PARTITIONS, HUNG CEILING
|
|
Work on Floor(s): 004
|
| 03/28/2014 |
121681616 |
01 |
A2 |
P APPROVED |
03/28/2014 |
0014427 RA |
ELLIS |
|
NOT APPLICABLE
|
|
INSTALLATION OF A/C UNIT AND GENERAL CONSTRUCTION TO SHOW THRU WALL DUCT.
|
|
Work on Floor(s): PH
|
| 01/28/2014 |
121907204 |
01 |
A2 |
R PERMIT-ENTIRE |
07/07/2014 |
0034693 RA |
CHIN |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS,
|
|
Work on Floor(s): 007
|
| 01/07/2014 |
121668999 |
01 |
A2 |
P APPROVED |
04/08/2014 |
0012884 RA |
TOY |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS,
|
|
Work on Floor(s): 003
|
| 11/06/2013 |
121833784 |
01 |
A2 |
X SIGNED OFF |
03/19/2014 |
0033590 RA |
MAI |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION INCLUSIVE OF INSTALLATION OF PARTITIONS, HUNG CEILING
|
|
Work on Floor(s): 004
|