| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/09/2024 |
141026814 |
01 |
A3 |
D A/P ENTIRE |
12/09/2024 |
0021943 RA |
ROIATTI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/12/2024 BUILDER PAVEMENT PLAN FILED AS PER PLAN PROVIDED.
|
|
Work on Floor(s): OSP
|
| 01/25/2022 |
123922149 |
02 |
A3 |
P APPROVED |
01/26/2022 |
|
ROIATTI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FILING BUILDERS PAVEMENT PLAN FOR 42.23 LIN
|
|
Work on Floor(s): OSP
|
| 12/10/2021 |
140940418 |
02 |
A2 |
P APPROVED |
01/21/2022 |
|
MAHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/19/2020 |
140940418 |
01 |
A2 |
X SIGNED OFF |
11/14/2025 |
0095097 PE |
MAHER |
|
NOT APPLICABLE
|
|
VAULT WORK FILED IN CONJUNCTION WITH ALT-3#: 123703769
|
|
Work on Floor(s): OSP
|
| 05/21/2020 |
123922149 |
01 |
A3 |
X SIGNED OFF |
04/04/2022 |
0021943 RA |
ROIATTI |
|
NOT APPLICABLE
|
|
FILING BUILDERS PAVEMENT PLAN FOR 42.23 LINEAR FEET.
|
|
Work on Floor(s): OSP
|
| 02/04/2020 |
123703769 |
01 |
A2 |
X SIGNED OFF |
02/04/2022 |
0021943 RA |
ROIATTI |
|
NOT APPLICABLE
|
|
1. REMOVE 2" THICK LAYER OF STUCCO FROM ENTIRE FACADE 2. POINT ENTIRE FAC
|
|
Work on Floor(s): CEL,OSP 001 thru 006
|
| 12/31/2018 |
123374614 |
02 |
A2 |
P APPROVED |
01/07/2019 |
|
CONNOLLY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 TEMPORARY VAULT SHORING AS PER PLANS FILED
|
|
Work on Floor(s): CEL,001
|
| 10/09/2018 |
123374614 |
01 |
A2 |
R PERMIT-ENTIRE |
01/28/2019 |
0079413 PE |
CONNOLLY |
|
NOT APPLICABLE
|
|
TEMPORARY VAULT SHORING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): CEL,001
|
| 05/05/2010 |
120340238 |
01 |
A2 |
X SIGNED OFF |
11/03/2010 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE, EGRESS OR O
|
|
Work on Floor(s): ROF
|