| 04/12/2018 |
140755957 |
01 |
A2 |
R PERMIT-ENTIRE |
01/05/2021 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS FIRED BOILER (NYC BOILER NO. 78289-01)
|
|
Work on Floor(s): CEL
|
| 08/20/2002 |
103240743 |
01 |
A2 |
R PERMIT-ENTIRE |
03/12/2003 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS FIRED PACKAGE HIGH PRESSURE BOILER AND INSTALL BOILER ROOM
|
|
Work on Floor(s): 2
|
| 01/15/1993 |
100574843 |
01 |
A2 |
R PERMIT-ENTIRE |
01/22/1993 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER & CONNECT TO EXISTING GAS SERVICE.NO CHANGE IN EGRESS
|
|
Work on Floor(s): CEL
|
| 07/12/1991 |
100297527 |
01 |
A2 |
J P/E DISAPPROVED |
07/17/1991 |
0063367 PE |
STASZEWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF CENTRAL STATION TRANSMITTER FOR THE SPRINKLER
|
|
Work on Floor(s): BSM
|