 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/25/2019 |
123781069 |
02 |
A2 |
P APPROVED |
07/26/2019 |
|
MASSAND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,OSP
|
| 06/03/2019 |
140839788 |
02 |
A2 |
P APPROVED |
06/03/2019 |
|
FU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1FL,CEL
|
| 05/29/2019 |
123781069 |
01 |
A2 |
X SIGNED OFF |
09/16/2019 |
0044402 PE |
MASSAND |
|
NOT APPLICABLE
|
|
INTERIOR AND EXTERIOR RENOVATION OF A DESSERT STORE WITH REPAIRING WALL,
|
|
Work on Floor(s): 001,OSP
|
| 03/28/2019 |
140839788 |
01 |
A2 |
R PERMIT-ENTIRE |
05/06/2019 |
0090920 PE |
FU |
|
NOT APPLICABLE
|
|
PLUMBING WORK, MINOR INTERIOR PARTITION, NEW FLOORING AND WALL FINISH. NO
|
|
Work on Floor(s): 1FL,CEL
|
| 08/29/2005 |
104219980 |
01 |
A2 |
R PERMIT-ENTIRE |
08/31/2005 |
0058090 PE |
Wai |
|
NOT APPLICABLE
|
|
Install boilers and storage tanks. No change in egress, occupancy or use i
|
|
Work on Floor(s): CEL
|
| 07/30/2002 |
103223049 |
01 |
A2 |
R PERMIT-ENTIRE |
04/24/2003 |
0076805 PE |
CHRYSLER |
|
NOT APPLICABLE
|
|
BUILD BOILER ROOM. INSTALL BOILER AND OI L BURNER
|
|
Work on Floor(s): CEL
|
| 04/26/2002 |
103143260 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/09/2002 |
0054064 PE |
CHOY |
|
NOT APPLICABLE
|
|
INSTALL NEW BOILER ROOM,NEW OIL BOILER WITH CARLIN OIL BURNER IN EXISIT
|
|
Work on Floor(s): CEL
|
| 10/30/2000 |
102789804 |
01 |
A3 |
R PERMIT-ENTIRE |
12/11/2000 |
|
GI MENG |
|
NOT APPLICABLE
|
|
INSTALL STOREFRONT AWNING __(MINA FASHION TRADING INC)
|
|
Work on Floor(s): 1
|