| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/26/2026 |
120296125 |
12 |
A1 |
P APPROVED |
03/30/2026 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ,001,002,003 004 thru 005
|
| 04/27/2022 |
120296125 |
11 |
A1 |
P APPROVED |
05/02/2022 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ,001,002,003 004 thru 005
|
| 03/17/2022 |
120296125 |
10 |
A1 |
P APPROVED |
04/04/2022 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NO WORK APPLICATION. CHANGE TO USES ON CELL
|
|
Work on Floor(s): CEL,MEZ,001,002,003 004 thru 005
|
| 07/02/2021 |
120296125 |
09 |
A1 |
P APPROVED |
02/23/2022 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NO WORK APPLICATION. CHANGE TO USES ON CELL
|
|
Work on Floor(s): CEL,MEZ,001,002,003 004 thru 005
|
| 11/12/2019 |
123752670 |
02 |
A2 |
P APPROVED |
11/18/2019 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): MEZ
|
| 10/07/2019 |
120296125 |
08 |
A1 |
P APPROVED |
11/18/2019 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,MEZ,005,004
|
| 09/25/2019 |
123748178 |
01 |
A2 |
X SIGNED OFF |
10/22/2019 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
DEMOLITION AND RELOCATION OF INTERIOR NON-BEARING PARTITIONS AND DOORS. NO
|
|
Work on Floor(s): 005
|
| 08/01/2019 |
123752670 |
01 |
A2 |
X SIGNED OFF |
11/22/2019 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
MEZZANINE RENOVATION. TO MOVE INTERIOR PARTITION, REPLACE CEILING AND LIGH
|
|
Work on Floor(s): MEZ
|
| 07/25/2019 |
123780159 |
01 |
A2 |
P APPROVED |
07/31/2019 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
NEW INTERIOR PARTITIONS AND DOOR
|
|
Work on Floor(s): SUB,CEL
|
| 04/19/2019 |
123514107 |
01 |
A2 |
R PERMIT-ENTIRE |
08/06/2019 |
0080474 PE |
BERMAN |
|
NOT APPLICABLE
|
|
ADDITIONS TO EXISTING APPROVED FIRE ALARM SYSTEM. CONSTRUCTION FLOORS:
|
|
Work on Floor(s): SC1,CEL,MEZ,ROF 001 thru 019
|
| 04/16/2019 |
120296125 |
07 |
A1 |
P APPROVED |
05/10/2019 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,MEZ,005,004
|
| 03/21/2019 |
123730025 |
01 |
A2 |
X SIGNED OFF |
09/25/2020 |
0089378 PE |
YOUSSEF |
|
NOT APPLICABLE
|
|
FRAMING FOR NEW ROOF TANK IN ASSOCIATION WITH NEW SPRINKLER SYSTEM.
|
|
Work on Floor(s): ROF
|
| 03/13/2019 |
123715131 |
01 |
A2 |
J P/E DISAPPROVED |
03/18/2019 |
0035052 RA |
SCHLAEN |
|
NOT APPLICABLE
|
|
EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPA
|
|
Work on Floor(s): 001 thru 019
|
| 02/27/2019 |
123658130 |
01 |
A2 |
R PERMIT-ENTIRE |
06/26/2019 |
0075441 PE |
CHIU |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT HIGH-RISE OFFICE BUILDING FOR
|
|
Work on Floor(s): SC, CEL,001,MEZ,ROF 002 thru 019
|
| 10/05/2018 |
123582943 |
04 |
A2 |
P APPROVED |
11/07/2018 |
|
CHIU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 003
|
| 09/27/2018 |
123378371 |
02 |
A2 |
P APPROVED |
10/10/2018 |
|
BAALBAKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,001
|
| 08/29/2018 |
123130156 |
01 |
A2 |
X SIGNED OFF |
07/01/2020 |
0087083 PE |
FINLAY |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER APPROVED DRAWINGS. NO C
|
|
Work on Floor(s): CEL 001 thru 005 008 thru 018
|
| 08/22/2018 |
123582943 |
03 |
A2 |
P APPROVED |
08/23/2018 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 08/01/2018 |
123576308 |
01 |
A2 |
X SIGNED OFF |
09/09/2020 |
0087083 PE |
FINLAY |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER APPROVED DRAWINGS. NO C
|
|
Work on Floor(s): 003
|
| 07/12/2018 |
123477077 |
01 |
A2 |
X SIGNED OFF |
10/09/2018 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
FILING TO MODIFY FIRE SUPPRESSION SYSTEM. NO OTHER WORK TO BE DONE. NO C
|
|
Work on Floor(s): 001
|
| 07/05/2018 |
120296125 |
06 |
A1 |
P APPROVED |
07/20/2018 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,MEZ,005,004
|
| 07/03/2018 |
123378371 |
01 |
A2 |
X SIGNED OFF |
11/19/2018 |
0077062 PE |
BAALBAKI |
|
NOT APPLICABLE
|
|
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING RESTAURANT UNDER THE
|
|
Work on Floor(s): SUB,CEL,001
|
| 07/02/2018 |
123582943 |
02 |
A2 |
X SIGNED OFF |
11/07/2018 |
0075441 PE |
CHIU |
|
NOT APPLICABLE
|
|
REPLACE EXISTING PLUMBING FIXTURES AND INSTALL NEW FIXTURES PER SCHEDULE
|
|
Work on Floor(s): 003
|
| 07/02/2018 |
123582943 |
01 |
A2 |
X SIGNED OFF |
11/07/2018 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
RENOVATE THIRD FLOOR. RELOCATE NON BEARING PARTITIONS. REPLACE HUNG CEILIN
|
|
Work on Floor(s): 003
|
| 11/17/2017 |
121228322 |
03 |
A2 |
P APPROVED |
11/21/2017 |
|
YOUSSEF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 019
|
| 11/06/2017 |
140711709 |
01 |
A2 |
X SIGNED OFF |
02/11/2019 |
0068615 PE |
BOTTA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 4 NEW SPLIT SYSTEM AIR CONDITIONERS ON 18TH FLOOR SERVING
|
|
Work on Floor(s): 018,019,ROF
|
| 07/21/2017 |
123072450 |
01 |
A2 |
X SIGNED OFF |
07/21/2020 |
0087083 PE |
FINLAY |
|
NOT APPLICABLE
|
|
DIRECT REPLACEMENT OF THE PREVIOUSLY APPROVED/EXISTING FCS WHICH WAS INSTA
|
|
Work on Floor(s): 0SC,001,003,006,009,012
|
| 06/20/2017 |
140658820 |
01 |
A3 |
X SIGNED OFF |
02/13/2019 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
FACADE SITE SAFETY PLAN FILED IN CONJUNCTION WITH APPLICATION # 121228322
|
|
Work on Floor(s): OSP
|
| 06/05/2017 |
121228322 |
02 |
A2 |
P APPROVED |
07/03/2017 |
|
AUTAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 019
|
| 05/18/2017 |
121228322 |
01 |
A2 |
X SIGNED OFF |
12/21/2017 |
0089378 PE |
YOUSSEF |
|
NOT APPLICABLE
|
|
EXTERIOR FACADE WORK, MASONRY WORK AT PARAPETS, MISCELLANEOUS BRICKWORK RE
|
|
Work on Floor(s): 001 thru 019
|
| 04/17/2017 |
140630057 |
01 |
A3 |
R PERMIT-ENTIRE |
03/30/2018 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/29/2019 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 04/06/2017 |
140626749 |
01 |
A3 |
H P/E IN PROCESS |
04/06/2017 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/14/2017 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 10/03/2016 |
122202160 |
05 |
A2 |
P APPROVED |
10/04/2016 |
|
BAALBAKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 08/31/2016 |
122878877 |
01 |
A2 |
R PERMIT-ENTIRE |
11/17/2016 |
0013529 RA |
KATZ |
|
NOT APPLICABLE
|
|
INSTALL FIRE SUPPRESSION SYSTEM. GAS VALVE, COOKING EQUIPMENT, HOOD AND DU
|
|
Work on Floor(s): 001
|
| 08/26/2016 |
122202160 |
04 |
A2 |
P APPROVED |
08/31/2016 |
|
BAALBAKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 07/08/2016 |
120296125 |
05 |
A1 |
P APPROVED |
07/14/2016 |
|
BERZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,MEZ,005,004
|
| 03/21/2016 |
140462531 |
02 |
A2 |
P APPROVED |
03/22/2016 |
|
BOTTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,ROF 008 thru 017
|
| 03/01/2016 |
140462531 |
01 |
A2 |
X SIGNED OFF |
05/25/2017 |
0068615 PE |
BOTTA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF EXISTING CENTRAL AIR CONDITIONING SYSTEM WITH SPLIT SYSTEM
|
|
Work on Floor(s): 001,ROF 008 thru 017
|
| 02/24/2016 |
140454639 |
01 |
A2 |
H P/E IN PROCESS |
02/24/2016 |
0068615 PE |
BOTTA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/24/2016 REPLACEMENT OF EXISTING CENTRAL AIR CONDITIONING
|
|
Work on Floor(s): 001,ROF 008 thru 017
|
| 02/11/2016 |
122406967 |
01 |
A3 |
X SIGNED OFF |
01/18/2019 |
0051094 PE |
KATZ |
|
NOT APPLICABLE
|
|
FILING FOR FIRE PROTECTION PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): CEL,001,MEZ,ROF 002 thru 019
|