 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/30/2026 |
141029152 |
01 |
A3 |
J P/E DISAPPROVED |
06/29/2026 |
0029410 RA |
SAVANI |
|
NOT APPLICABLE
|
|
HEREWITH TO PROPOSE 81.9 LINEAR FEET BUILDERS PAVEMENT PLAN IN CONJUNCTION
|
|
Work on Floor(s): OSP
|
| 07/22/2019 |
123169855 |
04 |
A1 |
D A/P ENTIRE |
07/25/2019 |
|
LIBASCI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/05/2019 |
123836803 |
01 |
A2 |
J P/E DISAPPROVED |
04/09/2019 |
0079188 PE |
SCHELL |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS BEING FILED IN CONJUNCTION WITH ALT-1 #123169855 FOR R
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/05/2019 |
123836796 |
01 |
A2 |
J P/E DISAPPROVED |
05/23/2019 |
0079188 PE |
SCHELL |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS BEING FILED IN CONJUNCTION WITH ALT-1 #123169855 FOR R
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 12/13/2018 |
123169855 |
03 |
A1 |
P APPROVED |
12/18/2018 |
0070997 PE |
ISLAM |
|
NOT APPLICABLE
|
|
THIS SUBSEQUENT APPLICATION IS BEING FILED FOR RELATED STRUCTURAL WORK.
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 11/27/2018 |
123169855 |
02 |
A1 |
P APPROVED |
12/18/2018 |
0079188 PE |
SCHELL |
|
NOT APPLICABLE
|
|
THIS SUBSEQUENT APPLICATION IS BEING FILED FOR THE RELATED PLUMBING AND
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 10/18/2017 |
123169855 |
01 |
A1 |
P APPROVED |
12/18/2018 |
0023066 RA |
LIBASCI |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS BEING FILED FOR CHANGE OF USE OF TO TRANSIENT USE ON 2
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 02/02/2009 |
100635939 |
23 |
A1 |
J P/E DISAPPROVED |
12/07/2009 |
0038752 RA |
GUMUSYAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 06/02/2005 |
104130049 |
01 |
A2 |
R PERMIT-ENTIRE |
07/14/2005 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
INSTALLATION OF BOILER AND HOT WATER HEA TER. NO CHANGE IN USE, EGRESS O
|
|
Work on Floor(s): CEL
|
| 03/05/2004 |
103722740 |
01 |
A2 |
P APPROVED |
03/05/2004 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROVIDE ADDITIONAL SPRINKLER HEADS AS PER PLAN. NO CHANGE IN USE, EGRESS O
|
|
Work on Floor(s): 001
|
| 12/05/2003 |
100635939 |
22 |
A1 |
P APPROVED |
12/17/2003 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 05/24/2002 |
103174388 |
01 |
A2 |
X SIGNED OFF |
07/20/2005 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INSTALL ANSUL SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): CEL,001
|
| 07/17/2001 |
102509858 |
01 |
A2 |
R PERMIT-ENTIRE |
06/06/2002 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
REPLACE EXISTING KITCHEN EQUIPMENT AT EXISTING RESTAURANT . MINOR PLUMBING
|
|
Work on Floor(s): CEL,001
|
| 07/09/2001 |
102798322 |
02 |
A1 |
P APPROVED |
07/20/2001 |
0020929 RA |
Dalfino |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003
|
| 04/30/2001 |
102541171 |
02 |
A2 |
X SIGNED OFF |
02/25/2002 |
0048918 PE |
FORTUNE |
|
NOT APPLICABLE
|
|
MODIFICATION OF EXISTING SPRINKLER SYSTE M NO CHANGE INUSR EGRESS
|
|
Work on Floor(s): 2, 3
|
| 04/30/2001 |
102541171 |
01 |
A2 |
X SIGNED OFF |
02/25/2002 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING DUCTWORK NO CYHNGBIN USE EGRESS/OCCUPANCY
|
|
Work on Floor(s): 2, 3
|
| 01/17/2001 |
100635939 |
21 |
A1 |
D A/P ENTIRE |
07/13/2001 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/13/2001
|
|
Work on Floor(s): CEL 1 thru 5
|
| 11/03/2000 |
102798322 |
01 |
A1 |
R PERMIT-ENTIRE |
05/18/2001 |
0020929 RA |
Dalfino |
|
NOT APPLICABLE
|
|
Change in Use on the 2nd and 3rd floors TO OFFICES (UG6). CONSTRUCTION
|
|
Work on Floor(s): 002,003
|
| 09/26/2000 |
102778549 |
01 |
A2 |
R PERMIT-ENTIRE |
04/26/2001 |
0020929 RA |
Dalfino |
|
NOT APPLICABLE
|
|
Installation of new roof deck and railing on main roof. No change in occup
|
|
Work on Floor(s): ROF
|
| 12/02/1998 |
100635939 |
20 |
A1 |
D A/P ENTIRE |
12/02/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/11/1999
|
|
Work on Floor(s): CEL 1 thru 5
|
| 12/02/1998 |
100635939 |
19 |
A1 |
D A/P ENTIRE |
12/02/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/02/1998
|
|
Work on Floor(s): CEL 1 thru 5
|
| 05/19/1998 |
100635939 |
18 |
A1 |
P APPROVED |
06/23/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 04/22/1998 |
100635939 |
17 |
A1 |
P APPROVED |
06/23/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 08/29/1997 |
100635939 |
16 |
A1 |
P APPROVED |
09/26/1997 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 07/25/1997 |
100635939 |
15 |
A1 |
P APPROVED |
06/23/1998 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 07/25/1997 |
100635939 |
14 |
A1 |
P APPROVED |
06/23/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 06/12/1997 |
100635939 |
13 |
A1 |
P APPROVED |
06/23/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 03/20/1997 |
100635939 |
12 |
A1 |
P APPROVED |
03/20/1997 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 12/09/1996 |
100635939 |
11 |
A1 |
P APPROVED |
12/20/1996 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 10/28/1996 |
101396026 |
02 |
A2 |
X SIGNED OFF |
02/24/1999 |
0018270 RA |
JUST |
|
NOT APPLICABLE
|
|
SUBSEQUENT PL.-INSTALL SPRINKLER WATER MAIN.
|
|
Work on Floor(s): CEL,1, 2, 3, 4, 5 001 thru 005
|
| 09/19/1996 |
101396026 |
01 |
A2 |
X SIGNED OFF |
02/24/1999 |
0018270 RA |
JUST |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW SPRINKLER MAIN IN CELLAR,INSTALLATION OF NEW
|
|
Work on Floor(s): CEL 001 thru 005
|
| 09/13/1996 |
100635939 |
10 |
A1 |
P APPROVED |
12/20/1996 |
0048918 PE |
LIOTTAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 1 thru 5
|
| 09/09/1996 |
100635939 |
09 |
A1 |
P APPROVED |
12/20/1996 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 07/27/1996 |
100635939 |
08 |
A1 |
P APPROVED |
12/20/1996 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 08/05/1994 |
100635939 |
07 |
A1 |
P APPROVED |
12/20/1996 |
0048918 PE |
LIOTTAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 2FL,2FL,4FL,5FL,CEL,1
|
| 07/11/1994 |
100865191 |
01 |
A2 |
P APPROVED |
11/15/1994 |
0630771 PE |
FALADE |
|
NOT APPLICABLE
|
|
REVISE EXISTING SPRINKLER SYSTEM.
|
|
Work on Floor(s): CEL,1, 2, SW
|
| 06/23/1994 |
100635939 |
06 |
A1 |
P APPROVED |
06/23/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 5
|
| 05/05/1994 |
100635939 |
05 |
A1 |
D A/P ENTIRE |
05/05/1994 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/06/1996
|
|
Work on Floor(s): 2, 3, 4, 5, CEL,1
|
| 04/19/1994 |
100635939 |
04 |
A1 |
J P/E DISAPPROVED |
05/24/1994 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/22/1994
|
|
Work on Floor(s): 2, 3, 4, 5, CEL,1
|
| 03/24/1994 |
100635939 |
03 |
A1 |
P APPROVED |
06/23/1998 |
0020929 RA |
DALFINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2, 3, 4, 5, CEL,1
|