| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/15/2017 |
122592907 |
PR |
I LAA SIGNED OFF |
01/22/2018 |
FSC 001038 |
MACKIN |
|
REARRANGE SPRINKLER HEADS ON THE 11TH FLOOR,(1) SPRINKLER HEAD TO BE MOVED
|
|
Work on Floor(s): 011
|
| 08/23/2017 |
140685934 |
PR |
E LAA FILED |
08/23/2017 |
FSC 001038 |
MACKIN |
|
RELOCATING (1) SPRINKLER HEAD ON THE 11TH FLOOR, SPRINKLER HEAD RELOCATED
|
|
Work on Floor(s): 011
|
| 02/26/2015 |
140315139 |
PR |
E LAA FILED |
02/26/2015 |
FSC 000064 |
BLOCK |
|
REARRANGEMENT OF (55) SPRINKLER HEADS ON THE 24TH FLOOR AN (34) SPRINKLER
|
|
Work on Floor(s): 024,025
|
| 04/24/2013 |
110593625 |
PR |
I LAA SIGNED OFF |
06/28/2013 |
FSC 000323 |
FULEP |
|
RE-ARRANGE 12 FIRE SPRINKLER HEADS WITH APPROXIMATELY 48' OF 1" PIPE. NO C
|
|
Work on Floor(s): 001
|