| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/15/2026 |
104173270 |
35 |
A1 |
P APPROVED |
01/22/2026 |
|
NUEKOMM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF,BAS 001 thru 057
|
| 08/19/2025 |
104173270 |
34 |
A1 |
P APPROVED |
09/08/2025 |
0027779 RA |
NUEKOMM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 08/14/2025 |
104173270 |
33 |
A1 |
D A/P ENTIRE |
08/18/2025 |
0016592 RA |
CALDARI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/18/2025
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 03/07/2025 |
104173270 |
32 |
A1 |
D A/P ENTIRE |
07/30/2025 |
0016592 RA |
CALDARI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/07/2025
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 04/04/2024 |
104173270 |
31 |
A1 |
P APPROVED |
04/08/2024 |
|
MALHOTRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 06/05/2023 |
104173270 |
30 |
A1 |
P APPROVED |
07/31/2023 |
|
MALHOTRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 09/03/2020 |
104173270 |
29 |
A1 |
P APPROVED |
11/06/2020 |
|
MALHOTRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 08/26/2020 |
123670535 |
04 |
A2 |
P APPROVED |
09/23/2020 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/04/2020 |
123369586 |
02 |
A2 |
P APPROVED |
08/11/2020 |
|
LICALZI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 018 thru 019
|
| 01/14/2020 |
123688198 |
02 |
A2 |
P APPROVED |
01/15/2020 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 018
|
| 10/16/2019 |
123670535 |
02 |
A2 |
P APPROVED |
10/25/2019 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 07/29/2019 |
104173270 |
28 |
A1 |
P APPROVED |
07/17/2020 |
0013278 RA |
MALHOTRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|
| 06/20/2019 |
123688198 |
01 |
A2 |
X SIGNED OFF |
02/20/2020 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF (1) GAS FIRED HOT WATER HEATERS AND (1) HOT WATER STORAGE
|
|
Work on Floor(s): 018
|
| 05/28/2019 |
123554992 |
04 |
A2 |
P APPROVED |
05/29/2019 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL,SC1,SC2,SC3,MEZ 001 thru 001
|
| 05/15/2019 |
123554992 |
03 |
A2 |
P APPROVED |
05/20/2019 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,CEL,SC1,SC2,SC3
|
| 05/07/2019 |
123763551 |
01 |
A2 |
R PERMIT-ENTIRE |
09/11/2019 |
0015015 RA |
NICHOLSO |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR THE INTERIOR ALTERATION OF THE SPACE. THERE WILL BE NO
|
|
Work on Floor(s): 001,BAS,CEL,SC1,SC2,SC3
|
| 03/26/2019 |
123554171 |
03 |
A2 |
P APPROVED |
03/28/2019 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,SC2,SC3,CEL,BAS,MEZ 001 thru 001
|
| 03/19/2019 |
123554171 |
02 |
A2 |
P APPROVED |
03/25/2019 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,SC2,SC3,CEL,BAS,MEZ 001 thru 001
|
| 02/27/2019 |
123554992 |
02 |
A2 |
X SIGNED OFF |
02/21/2020 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING STANDPIPE AS SHOWN ON DRAWINGS. NO CHANGE TO USE,
|
|
Work on Floor(s): BAS,CEL,SC1,SC2,SC3
|
| 02/25/2019 |
123670535 |
01 |
A2 |
X SIGNED OFF |
10/29/2020 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAT PUMP AT SECOND FLOOR, AS PER PLANS HEREWITH SUBMITT
|
|
Work on Floor(s): 002
|
| 02/13/2019 |
123402594 |
01 |
A2 |
X SIGNED OFF |
11/01/2023 |
0071502 PE |
FISHER |
|
NOT APPLICABLE
|
|
FILE FOR ADDITIONS AND/OR MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM
|
|
Work on Floor(s): SC3,SC2,SC1,CEL,BAS,MZ1
|
| 11/21/2018 |
123554992 |
01 |
A2 |
X SIGNED OFF |
02/21/2020 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER HEADS AND RELARED PIPING AS SHOWN ON DRAWINGS. N
|
|
Work on Floor(s): BAS,CEL,SC1,SC2,SC3,MEZ 001 thru 001
|
| 11/21/2018 |
123554171 |
01 |
A2 |
X SIGNED OFF |
11/27/2019 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
NEW ADA TOILETS AND RELATED PLUMBING PIPING AS SHOWN ON DRAWINGS. NO CHANG
|
|
Work on Floor(s): SC1,SC2,SC3,CEL,BAS,MEZ 001 thru 001
|
| 11/20/2018 |
123554484 |
01 |
A2 |
X SIGNED OFF |
07/03/2019 |
0079953 PE |
KIEFER |
|
NOT APPLICABLE
|
|
STRUCTURAL MODIFICATION FOR THE EXTENSION OF THE EXISTING STAIR D TO SUB-C
|
|
Work on Floor(s): SC1,SC2,SC3
|
| 11/15/2018 |
123535941 |
01 |
A2 |
X SIGNED OFF |
06/14/2019 |
0013278 RA |
MALHOTRA |
|
NOT APPLICABLE
|
|
REMOVAL OF FLOOR SLABS FOR THE EXTENSION OF EXISTING STAIR D FROM SUB CELL
|
|
Work on Floor(s): SC1,SC2
|
| 10/29/2018 |
123369586 |
01 |
A2 |
R PERMIT-ENTIRE |
12/24/2019 |
0063885 PE |
LICALZI |
|
NOT APPLICABLE
|
|
GAS PIPING FOR ROOFTOP (19TH FLOOR TERRACE) BBQS. NO CHANGE IN EGRESS, USE
|
|
Work on Floor(s): 018 thru 019
|
| 10/24/2018 |
123346192 |
05 |
A2 |
P APPROVED |
10/26/2018 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,MEZ
|
| 09/26/2018 |
123346192 |
04 |
A2 |
P APPROVED |
09/27/2018 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,MEZ
|
| 08/15/2018 |
123346192 |
03 |
A2 |
P APPROVED |
08/30/2018 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,MEZ
|
| 07/20/2018 |
122929778 |
04 |
A2 |
P APPROVED |
08/03/2018 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,SC2,SC3,CEL
|
| 04/19/2018 |
123324946 |
03 |
A2 |
P APPROVED |
05/11/2018 |
|
MALHOTRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 DEMOLITION WORK TO ELEVATOR SHAFT AND ADJAC
|
|
Work on Floor(s): SC1,SC2,SC3,CEL,BAS,MEZ 001 thru 002
|
| 04/18/2018 |
122929778 |
03 |
A2 |
P APPROVED |
05/08/2018 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,SC2,SC3,CEL
|
| 02/08/2018 |
123346192 |
02 |
A2 |
P APPROVED |
04/02/2018 |
|
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,MEZ
|
| 12/28/2017 |
122082931 |
02 |
A2 |
P APPROVED |
12/29/2017 |
|
KINDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 10/16/2017 |
123162870 |
01 |
A2 |
X SIGNED OFF |
06/29/2023 |
0071502 PE |
FISHER |
|
NOT APPLICABLE
|
|
FILE FOR THE INSTALLATION OF A MANUAL AND AUTOMATIC SMOKE DETECTION AND
|
|
Work on Floor(s): SC3,SC2,SC1,CEL,BAS,001
|
| 10/16/2017 |
123326427 |
02 |
A2 |
P APPROVED |
01/24/2018 |
|
HILT IV |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,SC2,SC3,CEL,BAS
|
| 10/04/2017 |
122929778 |
02 |
A2 |
P APPROVED |
11/15/2017 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,SC2,SC3,CEL
|
| 07/31/2017 |
123303406 |
01 |
A2 |
J P/E DISAPPROVED |
08/02/2017 |
0031442 PE |
SCHWARTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/16/2018 INSTALLATION OF SPRINKLER HEADS, STANDPIPE AND RE
|
|
Work on Floor(s): 001
|
| 07/19/2017 |
123346192 |
01 |
A2 |
X SIGNED OFF |
10/31/2018 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER HEADS, STANDPIPE AND RELATED PIPING AS SHOWN ON
|
|
Work on Floor(s): BAS,001,MEZ
|
| 07/18/2017 |
104173270 |
27 |
A1 |
P APPROVED |
02/01/2018 |
|
MALHOTRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,SC3,ROF 001 thru 056
|