BIS Menu  |  After Hours Variance Permits  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M124637
NO PLUMBING INSPECTIONS COMPLETED FOR THIS PROPERTY
Premises: 30 CARMINE STREET MANHATTAN BIN: 1008364     Block: 527   Lot: 68
   

DOB NOW: Inspections


Filed: 30 CARMINE ST Census Tract:   67 Health Area:  6400
NONE Admin Area:   M - MANHATTAN Inspection Area:   R
NEW YORK, NY 10014 Community Board:   102
DOB Cross Street(s):   BLEECKER STREET,    BEDFORD STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   P - PICK-UP eFiled:   NO
Application Entered:   10/17/1994 Job Start Date:  
Last Change:   08/22/2025 Job End Date:  
Appointment Status:   
Last Inspection By:   WEISBART, F.       On     07/18/1995      
Field Disp:   F - POST DISCONNECT WARNING
Energize Recommendation:  
Objection Disposition:  

License #: Licensee Name: UNKNOWN
Firm: Firm Name: UNKNOWN
Firm Phone:   Firm Address:  

Work Started or Filed by Others: NO
Work Category:    Work To Be Done:   Total Fee:  $0.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   N/A
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: CIN CIN REALTY CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: F - POST-DISCONNECT WARNING 07/18/1995
Power Issued: Response:  

Follow-Up: V - OWNER OBJECTION 10/17/1994
Contractor's Comments:  

 
Inspection Details
 

*NO PLUMBING INSPECTIONS COMPLETED FOR THIS PROPERTY
INSPECTION FOR APPLICATION #: M124637
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/29/1994 10/17/1994 FWE W (15) (5)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(4) 07/18/1995 07/31/1995 FWE F (30) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  After Hours Variance Permits  |  Electrical Inspection Work Order  |  Back