| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/20/2018 |
340578841 |
04 |
A2 |
P APPROVED |
06/26/2018 |
|
ONYEAGOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 04/24/2018 |
340578841 |
03 |
A2 |
P APPROVED |
04/24/2018 |
|
ONYEAGOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 04/06/2018 |
340578841 |
02 |
A2 |
P APPROVED |
04/16/2018 |
|
ONYEAGOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 02/22/2018 |
340578841 |
01 |
A2 |
X SIGNED OFF |
08/02/2018 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
HEREBY FILE TO REPLACE EXISTING GAS PIPING AND ADD (3) ADDITIONAL HOT WATE
|
|
Work on Floor(s): 001 thru 006
|
| 02/01/2017 |
320613948 |
02 |
A3 |
P APPROVED |
04/26/2017 |
|
JABRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/02/2016 |
321446093 |
01 |
A2 |
X SIGNED OFF |
01/11/2017 |
0037169 RA |
TAILER |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF NEW CAFE AND BAKERY LOCATED
|
|
Work on Floor(s): 001
|
| 08/12/2016 |
320517838 |
11 |
A1 |
P APPROVED |
08/18/2016 |
|
JABRO |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 08/11/2016 |
320517838 |
10 |
A1 |
P APPROVED |
08/18/2016 |
0081571 PE |
ZHENG |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 006
|
| 05/13/2016 |
320577032 |
02 |
A2 |
P APPROVED |
05/31/2016 |
0081571 PE |
ZHENG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 006
|
| 05/10/2016 |
320577023 |
02 |
A2 |
P APPROVED |
06/10/2016 |
0081571 PE |
ZHENG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 04/28/2016 |
320517838 |
09 |
A1 |
P APPROVED |
05/27/2016 |
|
JABRO |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 04/21/2016 |
320517838 |
08 |
A1 |
P APPROVED |
05/27/2016 |
0081571 PE |
ZHENG |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 006
|
| 06/03/2015 |
321159269 |
03 |
A3 |
P APPROVED |
06/04/2015 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/06/2015 |
340257386 |
01 |
A3 |
X SIGNED OFF |
07/28/2016 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY EQUIPMENT WORK INCLUDING TEMPORARY PLATFORM AND
|
|
Work on Floor(s): 001 thru 006
|
| 03/20/2015 |
320517838 |
07 |
A1 |
P APPROVED |
04/06/2015 |
0074226 PE |
RYAN |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 006
|
| 03/06/2015 |
321159269 |
02 |
A3 |
P APPROVED |
03/18/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/01/2014 |
321159269 |
01 |
A3 |
X SIGNED OFF |
08/22/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 3
|
|
Work on Floor(s): OSP
|
| 05/19/2014 |
340144962 |
01 |
A2 |
X SIGNED OFF |
11/29/2016 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS BEING FILED FOR CUTTING AND CAPPING OF SPRINKLER TO CO
|
|
Work on Floor(s): ROF 001 thru 003
|
| 04/30/2014 |
340139380 |
01 |
A2 |
X SIGNED OFF |
05/04/2016 |
0079187 PE |
CHEN |
|
NOT APPLICABLE
|
|
SCOPE OF WILL INCLUDE PARTIAL BUILDING DEMOLITION WITH SHORING AS INDICATE
|
|
Work on Floor(s): ROF 001 thru 003
|
| 04/25/2014 |
320517838 |
06 |
A1 |
P APPROVED |
05/20/2014 |
0025160 RA |
JABRO |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 03/24/2014 |
320517838 |
05 |
A1 |
P APPROVED |
04/02/2014 |
|
JABRO |
|
AMENDED 05/20/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 12/06/2013 |
320517838 |
04 |
A1 |
X SIGNED OFF |
06/30/2017 |
0025160 RA |
JABRO |
|
AMENDED 05/20/2014
|
|
EQUIPMENT FENCE APPLICATION IN CONJUNCTION WITH THE ALTERATION TYPE 1
|
|
Work on Floor(s): 001 thru 006
|
| 11/13/2013 |
340097558 |
01 |
A2 |
X SIGNED OFF |
07/11/2014 |
0025077 RA |
CARRANO |
|
NOT APPLICABLE
|
|
DEMOLITION OF INTERIOR PARTITIONS ON THE 3RD FLOOR. CAP AND REMOVE PLUMBIN
|
|
Work on Floor(s): 003
|
| 10/28/2013 |
320613948 |
01 |
A3 |
X SIGNED OFF |
06/05/2017 |
0025160 RA |
JABRO |
|
NOT APPLICABLE
|
|
BUILDERS PAVEMENT PLANS IN CONJUNCTION WITH ALTERATION TYPE 1 APPLICATION.
|
|
Work on Floor(s): OSP
|
| 10/21/2013 |
320517838 |
03 |
A1 |
X SIGNED OFF |
06/30/2017 |
0079187 PE |
CHEN |
|
AMENDED 05/20/2014
|
|
STRUCTURAL AND FOUNDATION APPLICATION IN CONJUNCTION WITH ALTERATION TYPE
|
|
Work on Floor(s): OSP 001 thru 006
|
| 09/06/2013 |
320577023 |
01 |
A2 |
X SIGNED OFF |
09/22/2016 |
0081571 PE |
ZHENG |
|
NOT APPLICABLE
|
|
NEW SPRINKLER APPLICATION IN CONJUNCTION WITH AN ALTERATION TYPE 1.
|
|
Work on Floor(s): 001 thru 006
|
| 08/26/2013 |
320577032 |
01 |
A2 |
X SIGNED OFF |
08/16/2016 |
0081571 PE |
ZHENG |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SMOKE DETECTION AND SPRINKLER ALARM.
|
|
Work on Floor(s): ROF 001 thru 006
|
| 08/16/2013 |
320517838 |
02 |
A1 |
X SIGNED OFF |
06/30/2017 |
0081571 PE |
ZHENG |
|
AMENDED 05/20/2014
|
|
PLUMBING AND MECHANICAL APPLICATION IN CONJUNCTION WITH THE ALTERATION TYP
|
|
Work on Floor(s): 001 thru 006
|
| 05/13/2013 |
320517838 |
01 |
A1 |
X SIGNED OFF |
06/30/2017 |
0025160 RA |
JABRO |
|
AMENDED 05/20/2014
|
|
APPLICATION TO CONVERT AND ENLARGE THE EXISTING WAREHOUSE BUILDING TO GENE
|
|
Work on Floor(s): 001 thru 006
|