| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
1 |
20-1 POLE |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER PNL NEW MULTIWIRE CKTS-NO SIMULATANEOUS MEANS OF DISCONNECT 210.4 (B) |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |
| |
| 002 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED 1 FLR REFRIG.COMPRESSOR TIME CLOCK IN DELI /JUICE BAR AREA 250.110 |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |
| |
| 003 |
(308) |
CONDUCTORS ARE NOT PROPERLY INSTALLED/TERMINATED FLR TIME CLOCK NEUTRAL AND EQUIP.GRD FOR SJ IMPROPERLY SPLICED 110.14(B) |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |
| |
| 004 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED 1FL TRACK LIGHTING CHASE NIPPLES NOT MAKING CONTRACT WITH BOX RACEWAY SYSTEM |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |
| |
| 005 |
( 53) |
GFCI HAS NOT BEEN PROVIDED 1FL DELI CASE RECEPTACLES NOT GFCI,PROTECTED PER MANUFACTURES SPEC 2210.8 |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |
| |
| 006 |
(272) |
EQUIPMENT GROUNDING CONDUCTOR NOT PROPERLY INSTALLED ROOF EQUIPMENT GRD FOR REFRIG COMPRESSORS UNDERSIZED PER.TABLE 250.122 |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |
| |
| 007 |
(272) |
EQUIPMENT GROUNDING CONDUCTOR NOT PROPERLY INSTALLED ROOF IMPROPER TERMINATION OF EQUIP GRDS IN JUCTION BOX FOR COMPRESSORS 250.8.110.14 |
RSLV |
02/27/2013 |
02/27/2013 |
03/18/2013 |