BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M343891
NO PLUMBING INSPECTIONS COMPLETED FOR THIS PROPERTY
Premises: 300 8 AVENUE MANHATTAN BIN: 1014192     Block: 775   Lot: 1
   
Application Completed and Certified

Filed: 300 8 AV Census Tract:   91
001 Admin Area:   M - MANHATTAN Inspection Area:   P
NEW YORK, NY 10001 Community Board:   104
DOB Cross Street(s):   WEST 25 STREET,    WEST 26 STREET
Status:   C - JOB IS SIGNED OFF 09/26/2013
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   08/10/2013 Job Start Date:   08/07/2013
Last Change:   09/26/2013 Job End Date:   11/07/2013
Appointment Status:   
Last Inspection By:   SAMARAS TASOS       On     09/18/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012537 Licensee Name: RU W HUANG
Firm: 004357 Firm Name: ATMOS ELECTRIC SVCE CORP
Firm Phone: 718-888-1501  Firm Address: 15-25 132 STREET 2ND FLOOR COLLEGEPOINT NY 11356 

Work Started or Filed by Others: NO
Work Category:   S - SHOP INSPECTION Work To Be Done:   Total Fee:  $55.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   STORE
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: HADI SALEH
Owner Business Name: CHELSEA FINE FOOD
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

Sign Dimensions : 8 Ft 0 In  BY  3 Ft 0 In  Total Sq. Ft. of Sign: 24
Sign Type : A
Total Circuits: 1 Total Lamps: 0
Watts (Lamps): 80 Number of Trans: 1 VA of Each Trans: 300
Total Watts or VA: 240 A.W. Gauge of Wire: 12 No. of Sockets Per Circuit: 6
Material/Gauge: 0.60 GAUGE ALUMINUM AND 3/16" PLEXI
Sign Maker : SPACE SIGN
Sign Maker Address: 15-25 132 ST COLLEGE POINT NY 11356
Shop Address: 15-25 132 STREET MANHATTAN
Shop Phone: 718-961-1112
Shop Location Comments:
Sign Text: CHELSEA FINE FOOD

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SIGN WIRING - SHOP INSPECTION

 
Inspection Details
 

*NO PLUMBING INSPECTIONS COMPLETED FOR THIS PROPERTY
INSPECTION FOR APPLICATION #: M343891
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/18/2013 09/20/2013 TS1 C (10) (0) Y
INSPECTION COMMENTS: CERTIFICATE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back