BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M038431
NO PLUMBING INSPECTIONS COMPLETED FOR THIS PROPERTY
Premises: 403 EAST 76 STREET MANHATTAN BIN: 1045949     Block: 1471   Lot: 5
   
Application Completed and Certified

Filed: 411 E 76 ST Census Tract:   132 Health Area:  4300
4FL Admin Area:   M - MANHATTAN Inspection Area:   K
NEW YORK, NY 10021 Community Board:   108
DOB Cross Street(s):    1 AVENUE,    YORK AVENUE
Status:   C - JOB IS SIGNED OFF 02/14/1989
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   06/15/1988 Job Start Date:   05/26/1988
Last Change:   02/09/1989 Job End Date:   06/30/1988
Appointment Status:   
Last Inspection By:   ONA, G.       On     01/31/1989      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  G - NO COMMENT
Objection Disposition:  R - REMOVED

License #: 010228 Licensee Name: BARRY KATZEN
Firm: 000815 Firm Name: KATCO ELECTRIC INC
Firm Phone: 718-361-6600  Firm Address: 44-15 BARNETT AVENUE LONG ISLAND CITY NY 11104 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $125.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   E - Four Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: SOTHEBYS GALLERY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
SUB FEEDERS (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  1  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 6 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 1
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag: R - OBJECTION(S) RESOL
Power Requested: 06/15/1988 Notice: C - CALL TO OFFICE 01/05/1988
Power Issued: 06/15/1988 Response: S - SCHEDULE C. T. O 12/15/1988

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

*NO PLUMBING INSPECTIONS COMPLETED FOR THIS PROPERTY
INSPECTION FOR APPLICATION #: M038431
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/19/1988 07/27/1988 GO1 V G (30) (3)
INSPECTION COMMENTS: BSMT GROUND COVERS ETC
 
(2) 11/02/1988 11/09/1988 GO1 H X G (20) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(4) 01/31/1989 02/09/1989 GO1 C R G (60) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back