 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 08/10/2018 |
140792809 |
PR |
I LAA SIGNED OFF |
05/22/2019 |
MP 001971 |
ROTONDO |
|
IN MASTER BATHROOM RELOCATE (1) TOILET USING APPROX. 4' OF 4" WASTE PIPING
|
|
Work on Floor(s): 032
|
| 07/05/2018 |
140781679 |
PR |
I LAA SIGNED OFF |
07/18/2018 |
MP 001044 |
BASSOLIN |
|
INSTALL NEW IN LINE WATER PUMP FOR BOILER MAKEUP SYSTEM AT 33FL LEVEL. IN
|
|
Work on Floor(s): 033
|
| 06/20/2018 |
140777265 |
PR |
E LAA FILED |
06/20/2018 |
MP 001638 |
MEIMAROG |
|
IN APT 3G ON THE 3RD FLOOR, WE WILL REPLACE ONE (1) TOILET, ONE (1) BATHTU
|
|
Work on Floor(s): 003
|
| 06/20/2018 |
140777238 |
PR |
E LAA FILED |
06/20/2018 |
MP 001638 |
MEIMAROG |
|
IN APT. 8D ON 8TH FLOOR WE WILL REPLACE (1) TOILET, AND (1) LAVATORY ON EX
|
|
Work on Floor(s): 008
|
| 04/03/2018 |
140753940 |
PR |
I LAA SIGNED OFF |
06/11/2018 |
MP 001337 |
SAYERS |
|
REMOVE TUB AND INSTALL SHOWER ON THE EXISTING 2" WASTE AND VENT ROUGHING.
|
|
Work on Floor(s): 7TH
|
| 03/27/2018 |
140751648 |
PR |
E LAA FILED |
03/27/2018 |
MP 002350 |
PRESTIGI |
|
REPLACE TOILET IN EXISTING ROUGHING IN UNITE 32A
|
|
Work on Floor(s): 32A
|
| 03/27/2018 |
140751531 |
PR |
I LAA SIGNED OFF |
05/11/2018 |
MP 001102 |
ADAMSKI |
|
RUNNING WASTE VENT AND WATER PIPING FROM EXISTING BATHROOM FOR NEW ROUGHIN
|
|
Work on Floor(s): 012
|
| 02/02/2018 |
140736684 |
PR |
I LAA SIGNED OFF |
02/21/2018 |
MP 001044 |
BASSOLIN |
|
EMERGENCY REPLACEMENT OF 80' SECTION OF 3" WASTE LINES SERVING FOUR EXISTI
|
|
Work on Floor(s): CEL,0SC
|
| 01/25/2018 |
140734098 |
PR |
I LAA SIGNED OFF |
09/12/2018 |
MP 001638 |
MEIMAROG |
|
IN APT.11L ON THE 11TH FLOOR WE WILL REPLACE (1) TOILET, (1) BATHROOM SINK
|
|
Work on Floor(s): 011
|
| 01/12/2018 |
122599875 |
PR |
A LAA PREFILED |
01/12/2018 |
MP 000846 |
VACIRCA |
|
JOB WITHDRAWN 02 21 2018
|
|
Work on Floor(s): CEL 035
|
| 11/15/2017 |
140716526 |
PR |
I LAA SIGNED OFF |
12/05/2017 |
MP 001044 |
BASSOLIN |
|
INSTALL 1-1/2" CHECK VALVE ON EXISTING SPRINKLER LINE SERVING COMPACTOR RO
|
|
Work on Floor(s): CEL
|
| 11/02/2017 |
122595833 |
PR |
E LAA FILED |
11/15/2017 |
MP 000846 |
VACIRCA |
|
SUPERSEDE#12259218EWN#14484REPLACE 1-3"X7"NIPPLE &1-3"FLANGE ON GAS METER
|
|
Work on Floor(s): CEL 001 thru 035
|
| 10/26/2017 |
122595218 |
PR |
E LAA FILED |
10/30/2017 |
MP 001524 |
CRITELLI |
|
EWN14484 REPLACE 1-3"X7" NIPPLE AND 1-3" FLANGE ON GAS METER IN CELLAR DUE
|
|
Work on Floor(s): CEL 035
|
| 05/03/2017 |
140637540 |
PR |
E LAA FILED |
05/03/2017 |
MP 001914 |
COMBATES |
|
IN BATHROOM OF APARTMENT 19C ON THE 19TH FLOOR WE WILL INSTALL (2) NEW 1 1
|
|
Work on Floor(s): 019
|
| 08/24/2016 |
122579209 |
PR |
I LAA SIGNED OFF |
03/20/2017 |
MP 001332 |
VAGLICA |
|
IN APARTMENT #33B ON THE 33RD FLOOR REPLACE TO EXISTING ROUGHING (1) TOILE
|
|
Work on Floor(s): 033
|
| 06/21/2016 |
140511747 |
PR |
I LAA SIGNED OFF |
07/26/2016 |
MP 001884 |
NATKANIE |
|
REPLACE BATHTUB AND SHOWERBODY. PROVIDE ANEW WATER SUPPLY TO THE LAVATORY,
|
|
Work on Floor(s): 021
|
| 05/04/2015 |
140342902 |
PR |
I LAA SIGNED OFF |
03/23/2016 |
MP 000907 |
PEPE |
|
IN APT 20J ON THE 20TH FL, TO REPLACE ON EXISTING ROUGHING A TOILET,A WASH
|
|
Work on Floor(s): 020
|
| 12/30/2013 |
140148230 |
PR |
E LAA FILED |
12/30/2013 |
MP 000907 |
PEPE |
|
IN APT 20J ON THE 20TH FL,TO REPLACE ON EXISTING ROUGHING A TOILET, A WASH
|
|
Work on Floor(s): 020
|
| 12/23/2013 |
140147375 |
PR |
I LAA SIGNED OFF |
02/24/2014 |
MP 001071 |
WEISS |
|
HERBY LAA-1 APPLICATION IS BEING FILED FOR DIRECT-REPLACEMENT OF THE EXIST
|
|
Work on Floor(s): 007
|
| 10/03/2013 |
140121339 |
PR |
E LAA FILED |
10/03/2013 |
MP 000957 |
ABRAMO |
|
APT #2B: REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING: KITCHEN : 1-KIT
|
|
Work on Floor(s): 028
|
| 05/31/2013 |
140084021 |
PR |
I LAA SIGNED OFF |
06/26/2013 |
MP 001923 |
BALOGLOU |
|
IN THE CELLAR LAUNDRY ROOM REPLACE TOTAL OF (12) GAS FLEX CONNECTORS WITH
|
|
Work on Floor(s): CEL
|
| 03/04/2013 |
140059567 |
PR |
I LAA SIGNED OFF |
05/21/2013 |
MP 002115 |
GANIC |
|
REPLACE TO EXISTING ROUGHING (2) WATER CLOSETS, (2) LAVS AND (1) SHOWERBOD
|
|
Work on Floor(s): 011
|
| 12/16/2012 |
140044565 |
PR |
I LAA SIGNED OFF |
03/23/2013 |
MP 001101 |
KOUMPARO |
|
CAP AND REMOVE 1- WC AND 1- LAVATORY. REPLACE 1-KITCHEN SINK AND 1- DISHWA
|
|
Work on Floor(s): 019
|
| 05/16/2012 |
140016952 |
PR |
I LAA SIGNED OFF |
06/26/2012 |
MP 000957 |
ABRAMO |
|
CONTRACTOR TO REPLACE ONE (1) 6" STEEL PIPE APPROX. 80 FEET FOR CHW/HW
|
|
Work on Floor(s): CEL,SUB
|
| 05/24/2011 |
110541897 |
PR |
I LAA SIGNED OFF |
08/29/2011 |
MP 001660 |
BROFSKY |
|
IN APT 26A ON 26 FLOOR REPLACE TO EXISTING ROUGHING:3 WATER CLOSETS, 3 LAV
|
|
Work on Floor(s): 026
|
| 12/14/2010 |
110524754 |
PR |
I LAA SIGNED OFF |
03/08/2011 |
MP 001744 |
ALISEO |
|
REPLACE TWO SHOWER STALLS AND ONE BATHTUB IN APT 9D.
|
|
Work on Floor(s): 009
|
| 09/21/2010 |
110506266 |
PR |
I LAA SIGNED OFF |
11/10/2010 |
MP 001660 |
BROFSKY |
|
IN APT 4B ON THE 4TH FLOOR REPLACE TO EXISTING ROUGHING 3 WATER CLOSETS, 3
|
|
Work on Floor(s): 004
|
| 09/13/2010 |
110505178 |
PR |
I LAA SIGNED OFF |
03/17/2011 |
MP 001343 |
LEO |
|
RESUBMITTING THIS EXISTING LAA APPLICATION FOR APPROVAL TO INCLUDE JOB DES
|
|
Work on Floor(s): 007
|
| 04/13/2010 |
110501831 |
PR |
I LAA SIGNED OFF |
07/06/2010 |
MP 001823 |
HOURIE |
|
APT 6I-6FL REPLACE TO EX'G ROUGHING 1 TUB, 1 LAV, 1 TOILET, 1 KITCHEN SINK
|
|
Work on Floor(s): 006
|
| 11/05/2009 |
110489720 |
PR |
E LAA FILED |
10/20/2010 |
MP 001294 |
KREITZER |
|
REMOVE VIOLATION #34744742M INSTALL 5 SPRINKLER HEADS OFF DOMESTIC WATER O
|
|
Work on Floor(s): CEL
|
| 09/09/2009 |
110274550 |
PR |
I LAA SIGNED OFF |
09/17/2010 |
MP 001294 |
KREITZER |
|
REMOVE VIOL NUMBER 34744743Y. REMOVE FLEX CONNECTIONS TO 12 DRYERS WITH NE
|
|
Work on Floor(s): CEL
|
| 05/06/2009 |
110265748 |
PR |
I LAA SIGNED OFF |
05/15/2009 |
MP 001524 |
CRITELLI |
|
2008 CODE REPLACE BROKEN NIPPLE IN APT#11G INSTALL NEW 3/4" NIPPLE AND VAL
|
|
Work on Floor(s): 003 thru 035
|
| 04/30/2009 |
110265800 |
PR |
E LAA FILED |
04/30/2009 |
MP 001177 |
O'GRADY |
|
JOB WITHDRAWN 07 22 2009 2008 CODE PERFORM GAS PRESSURE TEST TO DETERMINE
|
|
Work on Floor(s): CEL 001 thru 035
|
| 07/19/2007 |
102410981 |
PR |
E LAA FILED |
07/19/2007 |
MP 001881 |
SAKELLAR |
|
IN APT 10E ON THE 10TH FLOOR.REPLACE EXISTING PLUMBING FIXTURES ON EXISTIN
|
|
Work on Floor(s): 010
|
| 02/20/2007 |
102402909 |
PR |
I LAA SIGNED OFF |
05/18/2007 |
MP 001592 |
JOHNSON |
|
TO REPLACE TOILET & LAVATORY IN THE SAME LOCATION ON EXISTING ROUGHING
|
|
Work on Floor(s): 007
|
| 12/20/2006 |
102400377 |
PR |
I LAA SIGNED OFF |
05/09/2007 |
MP 000613 |
HARRIS J |
|
TO SHUT DOWN H&C WATER RISERS TO REPLACE (2) 1/2" BRANCH CONTROL VALVES &
|
|
Work on Floor(s): 011
|
| 12/15/2006 |
102400206 |
PR |
E LAA FILED |
12/15/2006 |
MP 000738 |
WEINTRAU |
|
INSTALL PLUMBING WASTE,VENT, HOT & COLD WATER ADJACENT TO EXISTING SINK FO
|
|
Work on Floor(s): 012
|
| 12/04/2006 |
102399012 |
PR |
I LAA SIGNED OFF |
03/15/2007 |
MP 001781 |
KONTOROV |
|
THIS FILING IS FOR A DIRECT REPLACEMENT OF THE FIXTURES ON THE EXISTING RO
|
|
Work on Floor(s): 015
|
| 11/08/2006 |
102397498 |
PR |
I LAA SIGNED OFF |
01/10/2007 |
MP 001490 |
LOMBARDO |
|
A DIRECT REPLACEMENT ON THE EXISTING ROUGHING ONE KITCHEN SINK, ONE DISHWA
|
|
Work on Floor(s): 018
|
| 11/01/2006 |
102396952 |
PR |
E LAA FILED |
11/01/2006 |
MP 001328 |
LYNE |
|
ON THE 7TH FLR, IN APT# 7R, REPLACE HOT AND COLD VALVES IN KITCHEN.
|
|
Work on Floor(s): 007
|