BIS Menu  |  Property Browse  |  Application Data  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
LAA Application Details
Premises: 599 VAN SICLEN AVENUE BROOKLYN
BIN: 3090671    Block: 4088    Lot: 9 LAA #: 340578967
Documents Collected  |   Plumbing Insp   |   Payment History   |   Virtual Job Folder

Printable (PDF) version of Permit

DOB NOW: Inspections

Last Action: SIGNED-OFF BY LYP - 04/04/2018 (I)
Pre-Filed: 01/23/2018 Approved: 01/23/2018 10:21 AM Expiration: 01/23/2019
  Electronically Filed: Yes
Work Description
  Location Information (Filed At)
House No(s): 599 Street Name: VAN SICLEN AVE
Borough: BROOKLYN Block: 4088 Lot: 9 BIN: 3090671 CB No: 305
Work on Floor(s): CEL,001,002
  Fee Assessment
Fee Structure: STANDARD
Estimated Cost: Category 2 - Estimated Cost of Unlimited Work  $9,000.00
  Additional Information
Building Characteristics: 1, 2, or 3 Family
Administrative Notes: 030618 PAA DISAPP- CHECK/MONEY ORDER REQUIRED FOR BALANCE DUE OF $100. 030618 PAA DISAPP- MUST STATE REGISTER REPLACEMENT OF BOILER AND HOT WATER HEATER; PLEASE SEE CHECKLIST MAILED.
031518 PAA DISAPP-LISTING AGENCY NAME & ID INVALID; APPLICANT CONTACTED (#) (CORRECTED) 031918 PAA APPROVED  
Audit Results: ACCEPTED on  03/19/2018
  Applicant Information
Name: MARK S SHELL
Business Name: M & M PIPING AND HEATING Business Phone: 718-298-5200
Business Address: 95-26 SUTPHIN BOULEVARD, JAMAICA, NY 11435
License Type: MASTER PLUMBER
License Number: 002368
Applicant Insured By: PREFERRED CONTRACTORS INS Insurance Expires: 07/22/2018
  Work Detail
  Plumbing: Category 2 GAS PLUMBING WORK   Gas Authorization Required
  Proposed Work Summary:
IN CELLAR WE WILL REGISTER REPLACEMENT OF BOILER AND HOT WATER HEATER (1) WILLIAMSON BOILER, (1) CROWN, (1) STATE HWH AND (1) GE SMART WATER VENT THRU EXISTING CHIMNEY IN GOOD WORKING CONDITION. THE TWO SMALLER BOILER WILL REPLACE ONE LARGE BOILER. WE WILL TEST GAS FROM METER IN CELLAR TO BEHIND THE STOVE ON 1ST FLOOR AND 2ND FLOOR WE WILL REPLACE (1) 3/4 GAS VALVE AND 1 FLEX CONNECTOR BEHIND STOVE ON 1ST FLOOR AND STOVE ON 2ND FLOOR. THERE WILL BE NO GAS PIPE IN ANY PUBLIC HALLWAYS. FIRESTOP WILL NOT BE DISTURB. A0223/8MAIL,A0302/8MAIL_A0314/8LF,A0316/8LF  

Additional Gas Information
Meters:  2  CELLAR
Risers:  2  CELLAR-002
Gas Uses:   Heat    Cooking    Water Heater    
  Appliance Data
Total Number
of Appliance(s)
Floor Location
of Appliance
Item-Manufacturer
Name
Listing Agency
Name and ID #
Model Number
Input (BTUs/hr)
1 CEL GE-SMARTWATER CSA#2901-85 SG50T12AVH00 40000
1 CEL WILLIAMSON CSA#1502-01 GWA-105-N-T 105000
1 CEL STATE CSA#2901-85 GS640BCT 400 40000
1 CEL NEW YORKER INTERTEK ANSIZ21.13 BS103 70000
1 1 STOVE N/A N/A 999999
  Asbestos Abatement Compliance
The scope of work does not require related asbestos abatement as defined in the regulations of the NYC DEP.
ACP5 DEP Control #  3378656  CAI #  146087


If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Property Browse  |  Application Data  |  Back