BIS Menu  |  Application Data   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
LAA Application Details
Premises: 358 WEST 48 STREET MANHATTAN
BIN: 1025119    Block: 1038    Lot: 61 LAA #: 140399003
Documents Collected  |   Plumbing Insp   |   Payment History   |   Virtual Job Folder

Printable (PDF) version of Permit
Last Action: SIGNED-OFF BY DAC - 04/18/2018 (I)
Pre-Filed: 09/03/2015 Approved: 09/03/2015 2:28 PM Expiration: 09/03/2016
  Electronically Filed: Yes
Work Description
  Location Information (Filed At)
House No(s): 358 Street Name: WEST 48 STREET
Borough: MANHATTAN Block: 1038 Lot: 61 BIN: 1025119 CB No: 104
Work on Floor(s): BAS 002 thru 005 Apt/Condo No(s): 2 3 4 5
  Fee Assessment
Fee Structure: STANDARD
Estimated Cost: Category 1 - Estimated Cost of Limited Work  $4,500.00
  Additional Information
Building Characteristics: Other
Administrative Notes: 03/08/16-PAA PENDING REVIEW_03/17/16-PAA DISAP-PROVIDE PROOF(WITH
ORIGINAL CERTIFIED STAMP DOCUMENT) FROM DEPARTMENT OF BUILDINGS RECORDS SHOWING THE INSTALLATION OF EXISTING APPLIANCE(S) COMMERICAL COOKING & ANSUAL VALVE. SEE CKLST.__03/25/16-PAA APPROVED  
Audit Results: ACCEPTED on  03/25/2016
  Applicant Information
Name: ROBERTO VELAZQUEZ
Business Name: HUDSON RIVER MECH GROUP I Business Phone: 718-585-5758
Business Address: 1060 WASHINGTON AVENUE, BRONX, NY 10456
License Type: MASTER PLUMBER
License Number: 001212
Applicant Insured By: TOWER GROUP Insurance Expires: 07/13/2016
  Work Detail
  Plumbing: Category 1 (Estimated Cost $35,000 or Less)   GAS PLUMBING WORK   Gas Authorization Required
  Proposed Work Summary:
HUDSON RIVER IS GOING TO REPAIR FOUR 3/4" GAS RISERS IN BETWEEN THE BASEMENT CEILING WHERE RISERS GO UP TO THE APTS. LOCATED ON THE 2ND-5TH FLR. HUDSON RIVER WILL PERFORM AN INTEGRITY TEST FOR 13 APTS AND OVERHEAD PIPING. PLUMBERS REPLACED 80' OF 11/2" BLK PIPE FROM HEAD OF SERVICE_WITH 80' OF 2" BLK PIPE & DID THE INSTALLATION OF 13 250 LIGHT 250 METER BARS_IN THE BSMT AS PER CON ED. STATEMENT: FIRESTOP WILL NOT BE COMPROMISED OR WILL BE RESTORED. THERE IS NO PIPING IN PUBLIC HALLWAYS. APTS BEGIN ON 2ND FLR &_CONTINUE TO 5TH FLR. HIRED FOR APTS ONLY & HAVE NOTHING TO DO W/RESTAURANT. A0304/6JP/A0307/6JP/A0321/6JP  

Additional Gas Information
Meters:  13  BASEMENT
Risers:  13  BASEMENT, 2-5 FLR
Gas Uses:   Cooking   
  Asbestos Abatement Compliance
The scope of work is exempt from the asbestos requirement as defined in the regulations promulgated by the NYC DEP (15 RCNY 1-23(b)) or is an alteration to a building constructed pursuant to plans submitted for approval on or after April 1,1987, in accordance with §28-106.1.


If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Application Data