| NYC Department of Buildings | ||
| Query Inspection Results:3-18-39551 | ||
| Premises: 218 74 STREET BROOKLYN | Job No: 321839481 01 | ||
| BIN: 3148219 Block: 5928 Lot: 13 | Permit Number: 321839481 | ||
| Licensee: P 002397 | Permit Type: LA4 |
| Floor - Apts - Insp Area: - - |
| Work Description: DISCONNECT OPEN SPRINKLER HEAD FROM THE COMPACTOR ROOM ON 1ST FL AND THEN RECO |
| NNECT THE SPRINKLER HEAD BACK TO ITS ORIGINAL PLACE AND CONNECT BACK TO THE EX |
| Inspector Badge: | 300P | Date of Inspection: | 07/09/2018 | Time Scheduled: | 09:45 ACTUAL |
| Inspection Reference #: | 0020687944 | Status: | INSPECTION CONDUCTED | Type: | 6 - CERTIFICATION OF RESULTS |
| Accela Inspection #: | 0000000000000002387240 | ||||
| Scheduled Comments: N/A | |||||
| RESULTS: | |||||
| FLOOR | REF NO | TEST / INSPECTION | RESULT | ||
| 001 | 2387240 | SPRINKLER (PL)-SPRINKLER-HYDRO | PASS | ||
| COMMENTS: TOTAL: 0 |
| GAS DETAILS - AUTHORIZED FOR THE FOLLOWING END USES: NO AUTHORIZATIONS |