 |  |  |
| COMMENTS |
| TRANSFERRED |
08/04/2003 |
GAS TEST SATISFACTORY - W/O 30309751 ON 08/01/03 |
| TRANSFERRED |
08/04/2003 |
1- AMEND PLANS TO SHOW CORRECT LAYOUT OF GAS METERS, GAS BOILERS |
| TRANSFERRED |
08/04/2003 |
AND H/W HEATERS IN CELLAR, AMEND PLANS TO SHOW CORRECT MANUF., |
| TRANSFERRED |
08/04/2003 |
MODEL NO AND MEA NO. OF BOILERS AND H/W HEATERS. |
| TRANSFERRED |
08/04/2003 |
2- BOILERS NOT WIRED, FLUE PIPE INCOMPLETE ON BOILERS AND H/W |
| TRANSFERRED |
08/04/2003 |
HEATERS. |
| TRANSFERRED |
08/04/2003 |
3- PARTIAL ROUGHING- ROUGHING OK FOR APTS 1L, 1R, 2F, 2R, 3F, 3R. |
| TRANSFERRED |
08/04/2003 |
4- AMEND SCH B TO SHOW CORRECT LAYOUT OF PLUMBING FIXTURES ON ALL |
| TRANSFERRED |
08/04/2003 |
FLOORS. |
| TRANSFERRED |
08/04/2003 |
5- AMEND SCH.B TO SHOW 6 GAS BOILERS, 6 GAS METERS, 6 H/W HEATERS |
| TRANSFERRED |
08/04/2003 |
IN CELLAR, SHOW 2 TOILETS, 2 LAVS ON 1ST FLOORS. |
| TRANSFERRED |
08/04/2003 |
6- GAS TEST SATISFACTORY FOR APTS 1L, 1R, 2F, 2R, 3F, 3R. |
|
|
|
|
|
|
|
|
|
|
|
|