BIS Menu  |  Insp. Results   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Query Inspection Results: 3-03-10901
Premises: 42 MAIN STREET BROOKLYN Job No: 301232011  02
BIN: 3000085    Block: 36    Lot: 7502 Permit Number: 301232011
Licensee: P  001338 Permit Type: PLUMBING
WORK DESCRIPTION
1ST-10TH FLOOR - -
PLUMBING - NO DESCRIPTION

Inspector Badge: 1944 Date Inspected: 08/29/2003
Inspection Results: WORK INCOMPLETE

# of Meters: 22 Location: CELLAR
# of Risers: 22 Location: CELLAR TO ALL FLOORS
Gas Uses:
  Heat
  Cooking
  Dryer
  Boiler Pilot
 
Note: 'Y' = Work / Test Completed         'N' = Work Incomplete
N - GAS PIPING Y - FIXTURES N - GAS TEST
COMMENTS
NOT RESOLVED 09/02/2003 1- SUBMIT 900A.
NOT RESOLVED 09/02/2003 2- PARTIAL GAS PIPING, GAS PIPING OK IN BOILER ROOM AND GAS METER
NOT RESOLVED 09/02/2003 ROOM. ( LMP TO SUBMIT SEALED LETTER STATING THAT ALL GAS
NOT RESOLVED 09/02/2003 PIPING AND FITTING WERE INSTALLED PRE-RUILING AND HAVE BEEN
NOT RESOLVED 09/02/2003 INSTALLED PER CODE ).
NOT RESOLVED 09/02/2003 3- AMEND PLANS TO SHOW 2 D/W ON 8TH FLOOR.
NOT RESOLVED 09/02/2003 4- SUBMIT APPLIANCE LETTERS FOR D/W, W/M, GAS DRYERS FOR ALL
NOT RESOLVED 09/02/2003 FLOORS.
NOT RESOLVED 09/02/2003 5- GAS STOVES NOT YET INSTALLED.
NOT RESOLVED 09/02/2003 6- AMEND SCH.B TO SHOW 3 B/TUBS, S.STALLS ON FLOORS 2-7, 1 LAV.,
NOT RESOLVED 09/02/2003 1 TOILET IN CELLAR.
NOT RESOLVED 09/02/2003 7- GAS TEST FAILED.
NOT RESOLVED 09/02/2003 8- FIXTURES OK FOR CELLAR, 2-9.


If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Insp. Results