NYC Department of Buildings | ||
Query Inspection Results:2-18-09058 |
Premises: 925 HUNTS POINT AVENUE BRONX | Job No: 240229659 01 | ||
BIN: 2129345 Block: 2735 Lot: 20 | Permit Number: 240229659 | ||
Licensee: P 001370 | Permit Type: LA4 |
Floor - Apts - Insp Area: - - |
Work Description: INSTALL APPROXIMATELY 150 FEET OF 1" COPPER PIPE TO SUPPLY TWO WALL HYDRANTS. |
THIS LINE WILL BE TIED INTO THE EXISTING COLD WATER PIPES IN THE BUILDING. WE |
Inspector Badge: | 200P | Date of Inspection: | 07/26/2018 | Time Scheduled: | 09:28 ACTUAL |
Inspection Reference #: | 0020700770 | Status: | INSPECTION CONDUCTED | Type: | 6 - CERTIFICATION OF RESULTS |
Accela Inspection #: | 0000000000000002429071 | ||||
Scheduled Comments: N/A |
RESULTS: | |||||
FLOOR | REF NO | TEST / INSPECTION | RESULT | ||
CEL | 2429071 | WATER AND SANITARY-WS-FIXTURES-FINISH | PASS |
COMMENTS: TOTAL: 0 |
GAS DETAILS - AUTHORIZED FOR THE FOLLOWING END USES: NO AUTHORIZATIONS |