| NYC Department of Buildings | ||
| Comments for Work Order: 3-10-14082 | ||
| Premises: 185 YORK STREET BROOKLYN | Job No: 302330886 01 | ||
| BIN: 3398491 Block: 55 Lot: 7504 | Permit Number: 302330886 | ||
| Licensee: 001321 | Permit Type: PLUMBING | ||
| CODE | FLOOR | REF NO | SYSTEM | TEST / INSPECTION | INSPECTION DATE |
RESOLVING INSPECTION |
RESOLVED DATE |
| NEWOBJ | 000 | 0003117210 | 0 - ALL | I00B - NOT APPLICABLE | 09/28/2010 | 3-10-15279 | 10/13/2010 |
| Description: GAS STOPS NOT INSTALLED. | |||||||
| SCHEDB | ROF | 0003117209 | 7 - GAS | I00B - NOT APPLICABLE | 09/28/2010 | 3-10-14082 | 07/17/2013 |
| Description: MODIFY SCHEDULE B (1) TO AGREE WITH ACTUAL AND PLAN (0) FOR SCHEDULE B GAS FURNACE FOR FLOOR ROF | |||||||
| FGC 406.4 | 001 | 0003117208 | 7 - GAS | T72A - GAS PIPING GAS TEST LOW | 09/28/2010 | 3-10-14082 | 07/17/2013 |
| Description: VALVE & PIPING: TEST PRESSURE THREE (3 PSIG) MIN 30 MINUTES | |||||||
| SCHEDB | CEL | 0003117211 | 7 - GAS | I00B - NOT APPLICABLE | 09/28/2010 | 3-10-14082 | 07/17/2013 |
| Description: MODIFY SCHEDULE B (18) TO AGREE WITH ACTUAL AND PLAN (17) FOR SCHEDULE B GAS METER(S) FOR FLOOR CEL | |||||||
| SCHEDB | CEL | 0003117212 | 7 - GAS | I00B - NOT APPLICABLE | 09/28/2010 | 3-10-14082 | 07/17/2013 |
| Description: MODIFY SCHEDULE B AND PLAN (0) TO AGREE WITH ACTUAL (1) FOR SCHEDULE B GAS FURNACE FOR FLOOR CEL | |||||||
| SCHEDB | ROF | 0003117213 | 7 - GAS | I00B - NOT APPLICABLE | 09/28/2010 | 3-10-14082 | 07/17/2013 |
| Description: MODIFY SCHEDULE B (1) TO AGREE WITH ACTUAL AND PLAN (0) FOR SCHEDULE B GAS-PIPING FOR FLOOR ROF | |||||||
| NEWOBJ | 000 | 0003117207 | 0 - ALL | I00B - NOT APPLICABLE | 09/28/2010 | 3-10-14082 | 04/07/2014 |
| Description: W/S & GAS RGH PASS CEL,BSMNT 1 TO 6. | |||||||