|
||
NYC Department of Buildings | ||
Comments for Work Order: 2-08-06722 |
Premises: 951 BRUCKNER BOULEVARD BRONX | Job No: 201117576 01 | ||
BIN: 2120358 Block: 2735 Lot: 42 | Permit Number: 201117576 | ||
Licensee: 001913 | Permit Type: PLUMBING |
CODE | FLOOR | REF NO | SYSTEM | TEST / INSPECTION | INSPECTION DATE |
RESOLVING INSPECTION |
RESOLVED DATE |
SCHEDB | CEL | 0002248698 | 7 - GAS | I00B - NOT APPLICABLE | 10/28/2008 | 2-08-06722 | 03/19/2009 |
Description: MODIFY SCHEDULE B (2) TO AGREE WITH ACTUAL AND PLAN (0) FOR SCHEDULE B GAS BOILER (<350K BTUS) FOR FLOOR CEL | |||||||
SCHEDB | CEL | 0002248699 | 7 - GAS | I00B - NOT APPLICABLE | 10/28/2008 | 2-08-06722 | 03/19/2009 |
Description: MODIFY SCHEDULE B (0) TO AGREE WITH ACTUAL AND PLAN (2) FOR SCHEDULE B GAS FURNACE FOR FLOOR CEL | |||||||
NEWOBJ | 000 | 0002248700 | 0 - ALL | I00B - NOT APPLICABLE | 10/28/2008 | 2-08-06722 | 03/25/2009 |
Description: NEED TO REVIEW 6TH BOILER THAT IS FOR CELLAR AND HALLWAY THE BOILER IS HOOK UP TO 1ST FL GAS METER ALSO THERE IS OTHER BOILER FOR 1ST FL IN CELLAR. |