![]() |
|
|
| NYC Department of Buildings | ||
| Actions | ||
| NO RECORDS FOUND | ||
| Elevator violations for failure to file Periodic, Category 1, Category 5 and Affirmation of Correction issued in August 2023 or later are only available in DOB NOW: Safety. Search the DOB NOW public portal for these records. | |||
| Boiler violations for failure to file internal and external inspection reports and affirmation of correction issued in November 2023 or later are only available in DOB NOW: Safety. Search the DOB NOW public portal for these records. | |||
| Benchmark and AEUHAZ violations for failure to file an acceptable Certificate of Correction (COC) for a Class 1 summons issued in December 2025 or later are only available in DOB NOW: Safety. Search the DOB NOW public portal for these records. | |||
| Page: 1 | |||
| Premises: 47-14 VERNON BOULEVARD QUEENS | BIN: 4000060 Block: 29 Lot: 3 | ||
| NUMBER | TYPE | FILE DATE | |
| ALT 1214-13 | ALTERATION | 00/00/1913 | |
| ALT 904-13 | ALTERATION | 00/00/1913 | |
| ALT 1991-24 | ALTERATION | 00/00/1924 | |
| ALT 7068-32 | ALTERATION | 00/00/1932 | |
| ALT 5353-34 | ALTERATION | 00/00/1934 | |
| BN 1096-70E | BUILDING NOTICE | 00/00/1970 | |
| MISC 8411-46 | MISCELLANEOUS | 00/00/1946 | |
| PRS 2219-81 | PLUMBING REPAIR SLIP | 00/00/1981 | |
| V 081292C02F1 | DOB VIOLATION - ACTIVE | 08/12/1992 | |
| V 031699LL629124968 | DOB VIOLATION - ACTIVE | 03/16/1999 | |
| V* 020700LL629125247 | DOB VIOLATION - DISMISSED | 02/07/2000 | |
| V 032602LL629126081 | DOB VIOLATION - ACTIVE | 03/26/2002 | |
| V* 051514LBLVIO19498 | DOB VIOLATION - DISMISSED | 05/15/2014 | |
| V* 100115LBLVIO13696 | DOB VIOLATION - DISMISSED | 10/01/2015 | |
| V* 022417LBLVIO15310 | DOB VIOLATION - DISMISSED | 02/24/2017 | |
| VEL* 091998C02CV03 | VIOLATION ECB LIEN DISMISSED | 09/19/1998 | |
| VEC* 111413CSSUMM01 | ECB VIOLATION DISMISSED | 11/14/2013 | |
| VEC* 111413CSSUMM02 | ECB VIOLATION DISMISSED | 11/14/2013 | |