 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 05/03/2017 |
340500005 |
PR |
E LAA FILED |
05/03/2017 |
FSC 001063 |
LEVINE |
|
INSTALL 1 NEW SPRINKLER HEAD WITH APPROXIMATELY 20' OF 1" PIPE, ON 13TH FL
|
|
Work on Floor(s): 013
|
| 01/23/2013 |
340034732 |
PR |
I LAA SIGNED OFF |
06/06/2013 |
FSC 000912 |
CIANCIOT |
|
REMOVE & REPLACE TWO EXISTING SIDEWALL SPRINKLER HEADS. REMOVE & REPLACE
|
|
Work on Floor(s): 010
|
| 02/02/2005 |
301709569 |
PR |
I LAA SIGNED OFF |
06/22/2005 |
MP 010627 |
DEMENUS |
|
TEMPORARY HEAT IN BLDG DURING CONSTRUCTION. NATURAL GAS SALAMANDERS TO BE
|
|
Work on Floor(s): 001 thru 012
|