Electrical Application Details for App #: Y177792
NO RECORDS FOUND
Premises: 2114 AQUEDUCT AVENUE BRONX BIN: 2014572     Block: 3210   Lot: 80
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 2114 AQUEDUCT AV Census Tract:   251 Health Area:  1520
BOILER ROOM Admin Area:   Y - BRONX Inspection Area:   F
BRONX, NY 10453 Community Board:   205
Related Job Number:    240121122
DOB Cross Street(s):   WEST 180 STREET,    AQUEDUCT WALK BIKE PATH
Status:   C - JOB IS SIGNED OFF 01/25/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/25/2016 12:38 AM
Application Entered:   05/25/2016 Job Start Date:   06/01/2016
Last Change:   01/25/2017 Job End Date:   12/31/2016
Appointment Status:   
Last Inspection By:   GIUSEPPE IMBURGIA       On     01/20/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011008 Licensee Name: LAURENCE H ROBIN
Firm: 001260 Firm Name: ROBIN ELECTRICAL CO., INC
Firm Phone: 718-292-6535  Firm Address: 437 EAST 165TH ST. B704 BRONX NY 10456 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $52.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: DAVID DIAMOND
Owner Business Name: 2114 AQUEDUCT REALTY LLC
Authorized Representative:  DAVID COHEN
Relationship To Owner:   BROTHER IN LAW


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS                     
Buildings Total                       
Total Units : 1 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  ADDING NATURAL GAS BOOSTER. JOB DELAYED BY CON EDISON.

 
Inspection Details
 

*NO RECORDS FOUND
INSPECTION FOR APPLICATION #: Y177792
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/20/2017 01/23/2017 GIG C (44) (0) Y
INSPECTION COMMENTS: INSPECTION PASSED