BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y138804
NO RECORDS FOUND
Premises: 5355 HENRY HUDSON PARKWAY BRONX BIN: 2086250     Block: 5946   Lot: 52
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 5355 HENRY HUDSON PARKWAY Census Tract:   323 Health Area:  0100
ROOFTOP Admin Area:   Y - BRONX Inspection Area:   H
BRONX, NY 10471 Community Board:   208
DOB Cross Street(s):   WEST 252 STREET,    WEST 254 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/18/2007 9:59 AM
Application Entered:   10/18/2007 Job Start Date:   10/19/2007
Last Change:   08/22/2025 Job End Date:   10/31/2007
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 009601 Licensee Name: ARNOLD FINKELSTEIN
Firm: 000160 Firm Name: ARNOLD FINKELSTEIN
Firm Phone: 212-427-9051  Firm Address: 430 EAST 89TH STREET NEW YORK NY 10028 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $70.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ALBERT BAE
Owner Business Name: NORTHROP GRUMMAN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  2  3#2
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  100 AMP SINGLE PHASE 3 WIRE EQUIPMENT PLATFORM WITH MANUAL TRANSFER SWITCH AND GENERATOR LUG BOX. TAP FROM EXISTING SERVICE SWITCH INSTALLED BY OTHERS. BX-055

 
 

*NO RECORDS FOUND
INSPECTION FOR APPLICATION #: Y138804
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order