BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z163976
Premises: 126 CENTRAL PARK SOUTH MANHATTAN BIN: 1023758     Block: 1011   Lot: 45
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 128 CENTRAL PARK S Census Tract:   137 Health Area:  4700
9D Admin Area:   Z - UPPER MANHATTAN Inspection Area:   F
NEW YORK, NY 10019 Community Board:   105
DOB Cross Street(s):   AVENUE OF THE AMERICAS,    CENTRAL PARK EXIT 7 AVENUE
Status:   C - JOB IS SIGNED OFF 12/13/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  12/03/2017 6:03 AM
Application Entered:   12/03/2017 Job Start Date:   12/03/2017
Last Change:   12/13/2017 Job End Date:   12/02/2018
Appointment Status:   
Last Inspection By:   PANAYOTEDIS, STEPHEN       On     12/13/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011545 Licensee Name: RICHARD NEU
Firm: 003052 Firm Name: RICHARD NEU
Firm Phone: 718-227-2181  Firm Address: 4347 HYLAN BLVD STATEN ISLAND NY 10312 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
9 - OTHER
Total Fee:  $40.00
Other Work:   VIOLATION REMOVAL
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ELLY PATERAS
Owner Business Name: DOUGLAS ELLIMAN PROPERTIE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
009  9D                   
Buildings Total                     
Total Units : 8 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  THIS APPLICATION IS TO REPLACE AND CLOSE OUT APPLICATION #Z059415

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z163976
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/13/2017 12/13/2017 STP C (35) (0) Y
INSPECTION COMMENTS: PASS. OTHER WORK ON APPS Z151456 AND Z114158 WHICH COVERS APARTMENT RENOVATION




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order