| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
1 |
4#1 |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (FLOOR: 019)CONTRACTOR NEED TO PROVIDE LIST OF DEVICES, MOTORS AND CORRECT SCOOPOF WORK SO APP CAN BE UPDATE DURING NEXT INSPECTION |
RSLV |
08/21/2018 |
08/21/2018 |
02/12/2019 |
| |
| 002 |
(999) |
OTHER (FLOOR: 019)METAL BOXES ARE NOT GROUNDED (MC CABLE NOT TERMINATED IN THE BOX)T-OUT ART. 314.4 |
RSLV |
08/21/2018 |
08/21/2018 |
02/12/2019 |
| |
| 003 |
(999) |
OTHER (FLOOR: 019) LIGHT INSTALLED IN CLOSET NOT APPROVED ART. 410.16 |
RSLV |
08/21/2018 |
08/21/2018 |
02/12/2019 |
| |
| 004 |
(999) |
OTHER (FLOOR: 019) CLOSET LIGHT LOCATED IN STORAGE SPACE ART. 410.16 |
RSLV |
08/21/2018 |
08/21/2018 |
02/12/2019 |
| |
| 005 |
(999) |
OTHER (FLOOR: 019) MICRO/HOOD COMBO NOT ON DEDICATED LINE AM. 422.16 |
RSLV |
08/21/2018 |
08/21/2018 |
02/12/2019 |
| |
| 006 |
(999) |
OTHER (FLOOR: 019)GROUNDING CONDUCTORS NOT PROPERLY TERMINATED IN A/C DISCONNECTSWITCH ART. 250.8 |
RSLV |
08/21/2018 |
08/21/2018 |
02/12/2019 |
| |
| 007 |
(220) |
DOUBLE LUGGING IN SERVICE SWITCH (FLOOR: 019)110.14(A) A/C UNITE, GROUND CONDUCTOR NOT PROPERLY TERMINATE. |
RSLV |
02/12/2019 |
02/12/2019 |
03/14/2019 |
| |
| 008 |
(256) |
INSUFFICIENT SPACE ABOVE SERVICE EQUIPMENT (FLOOR: 019) 110.26(F)(1)(A), WORK SPACE NOT PROVIDE FOR PANEL. |
RSLV |
02/12/2019 |
02/12/2019 |
03/14/2019 |
| |
| 009 |
( 39) |
MOTOR NOT PROVIDED WITH PROPER RUNNING PROTECTION (FLOOR: 019)430.72, A/C AIR HANDLER NOT OF THE PROPER RUNNING PROTECTION. |
RSLV |
02/12/2019 |
02/12/2019 |
03/14/2019 |