Electrical Application Details for App #: Z162575
Premises: 115 CENTRAL PARK WEST MANHATTAN BIN: 1028618     Block: 1124   Lot: 27
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 115 CENTRAL PARK W Census Tract:   157 Health Area:  4000
APT 22E/F Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10023 Community Board:   107
DOB Cross Street(s):   WEST 71 STREET,    CENTRAL PARK EXIT WEST 72 ST
Status:   C - JOB IS SIGNED OFF 12/19/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/11/2017 1:29 PM
Application Entered:   09/11/2017 Job Start Date:   09/11/2017
Last Change:   12/19/2018 Job End Date:   09/11/2018
Appointment Status:   
Last Inspection By:   ALGERNON CHARLES       On     12/07/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010587 Licensee Name: HARRY FRENKEL
Firm: 002697 Firm Name: APOLLO ELECTRIC INC.
Firm Phone: 212-627-2561  Firm Address: 127 WEST 24TH ST,5TH FL STE#A NEW YORK NY 10011 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
7 - HVAC WIRING
T - TEMPORARY LIGHT & POWER
Total Fee:  $218.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: BETH KELLEY
Owner Business Name: KELLEY DESIGN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  2  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
022    88  29  31  88         
022  22F  19  39  21  88             
Buildings Total 107  68  16  52  176              
Total Units : 424 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 2 #4-Wire 0 #10-Wire 0
Existing Meters 2 + New Meters 0 - Removed Meters 0 = Total Meters 2

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 09/11/2017 Notice:  
Power Issued: 09/11/2017 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z162575
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/07/2018 12/07/2018 AYC C (70) (0) Y
INSPECTION COMMENTS: MINOR REMEDIATION WAS NEEDED AND COMPLETED. CERTIFIED.