![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z161619 | ||
| Premises: 645 WEST END AVENUE MANHATTAN | BIN: 1034102 Block: 1251 Lot: 62 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 645 W END AV | Census Tract: 179 | Health Area: 3120 | |
| ALL FLOORS SERVED,MR | Admin Area: Z - UPPER MANHATTAN | Inspection Area: D | ||
| NEW YORK, NY 10025 | Community Board: 107 | |||
| DOB Cross Street(s): WEST 91 STREET, WEST 92 STREET | |||
| Status: C - JOB IS SIGNED OFF 11/09/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 07/10/2017 1:34 PM | |
| Application Entered: 07/10/2017 | Job Start Date: 07/11/2017 | ||
| Last Change: 11/09/2017 | Job End Date: 07/11/2020 | ||
| Appointment Status: | |||
| Last Inspection By: ALBERT HANSON On 11/09/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011986 | Licensee Name: | ANTHONY LUCIANO | |
| Firm: | 003652 | Firm Name: | JAM ELECTRICAL CORP | |
| Firm Phone: | 212-265-0142 | Firm Address: | 1133 6TH AVE 28TH FLOOR NEW YORK NY 10036 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $248.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | FRANK POMPEA | ||||||
| Owner Business Name: | ORSID REALTY CORPORATION | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 11/03/2017 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: N/A | |||
|
|