BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z160107
Premises: 208 CENTRAL PARK SOUTH MANHATTAN BIN: 1024919     Block: 1030   Lot: 39
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 210 CENTRAL PARK S Census Tract:   137 Health Area:  4700
BASEMENT Admin Area:   Z - UPPER MANHATTAN Inspection Area:   F
NEW YORK, NY 10019 Community Board:   105
Special Place Name:   BOILER ROOM
DOB Cross Street(s):   CENTRAL PARK EXIT 7 AVENUE,    COLUMBUS CIRCLE
Status:   C - JOB IS SIGNED OFF 05/19/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/10/2017 12:34 PM
Application Entered:   04/10/2017 Job Start Date:   04/10/2017
Last Change:   05/19/2017 Job End Date:   12/15/2017
Appointment Status:   
Last Inspection By:   MICHAEL QUERY       On     05/19/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010144 Licensee Name: JOHN IZZO
Firm: 002205 Firm Name: RESPONSE ELECTRIC INC.
Firm Phone: 718-599-9753  Firm Address: 36 FROST STREET BROOKLYN NY 11211 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $453.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: 210 CENTRAL PARK SOUTH IN
Authorized Representative:  ADAM ZERKA
Relationship To Owner:   AGENT


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  4  4 SETS OF 350 MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS            225         
BAS      225         
Buildings Total        450           
Total Units : 464 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  FROM 2 EXISTING 600A SWITCHES, INSTALL (1) NEW 400A FEEDER AND (1) NEW 500A FEEDER FOR CHILLER. INSTALL (1) 20A CIRCUITFOR NEW MAKE UP WATER PUMP. INSTALL 4 NEW FIXTURES AT CHILLER LOCATION.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z160107
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/19/2017 05/19/2017 MQY C (48) (0) Y
INSPECTION COMMENTS: LOAD SIDE OF EXISTING 2ND LEVEL SWITCH. FUSES WERE NOT REPLACED. 2 NEW 3RD LEVEL DISCONNECT SWITCHES INSTALLED FOR CHILLER




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back