![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z159931 | ||
| Premises: 310 WEST 86 STREET MANHATTAN | BIN: 1033922 Block: 1247 Lot: 40 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 310 W 86 ST | Census Tract: 171 | Health Area: 3400 | |
| APARTMENT 8A | Admin Area: Z - UPPER MANHATTAN | Inspection Area: D | ||
| NEW YORK, NY 10024 | Community Board: 107 | |||
| DOB Cross Street(s): WEST END AVENUE, RIVERSIDE DRIVE | |||
| Status: C - JOB IS SIGNED OFF 02/15/2018 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 03/29/2017 1:54 PM | |
| Application Entered: 03/29/2017 | Job Start Date: 03/29/2017 | ||
| Last Change: 02/15/2018 | Job End Date: 03/29/2018 | ||
| Appointment Status: | |||
| Last Inspection By: JOFFRE PENA On 01/26/2018 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011701 | Licensee Name: | ALBERTO SANCHEZ | |
| Firm: | 003779 | Firm Name: | GRX EURO ELECTRIC CORP | |
| Firm Phone: | 718-545-0035 | Firm Address: | 18-02 26TH ROAD ASTORIA NY 11102 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $136.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | EVANGELOS ANTONIADES | ||||||
| Owner Business Name: | ALPHACRAFT CONSTRUCTION | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 008 | A | 90 | 7 | 35 | 80 | |||||||
| Buildings Total | 90 | 7 | 35 | 80 | ||||||||
| Total Units : 212 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 1 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 1 | + New Meters | 1 | - Removed Meters | 1 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 03/29/2017 | Notice: | |
| Power Issued: | 03/29/2017 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: 1. GENERAL WIRING & NEW PANELBOARD 2. NEW SERVICE, METER-BANK & CONDUIT INSTALLED BY OTHERS | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 01/26/2018 | 01/29/2018 | JRP | C | (45) | (0) | Y | |||
| INSPECTION COMMENTS: | PASS | |||||||||