| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z157925 | ||
| Premises: 1 WEST 72 STREET MANHATTAN | BIN: 1028637 Block: 1125 Lot: 25 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 1 W 72 ST | Census Tract: 157 | Health Area: 4000 | |
| APT. NO.44 | Admin Area: Z - UPPER MANHATTAN | Inspection Area: E | ||
| NEW YORK, NY 10023 | Community Board: 107 | |||
| Special Place Name: BY CENTRAL PARK WEST | ||||
| DOB Cross Street(s): CENTRAL PARK EXIT WEST 72 ST, COLUMBUS AVENUE | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 11/13/2016 10:43 PM | |
| Application Entered: 11/13/2016 | Job Start Date: 11/14/2016 | ||
| Last Change: 08/22/2025 | Job End Date: 11/07/2017 | ||
| COMPLETION FEE WAS BILLED | |||
| Appointment Status: | |||
| Last Inspection By: SCHULER, THOMAS On 11/09/2017 | |||
| Field Disp: V - OBJCTN ISSD: JOB INCOMPLT | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011541 | Licensee Name: | GERARD M BALMIR | |
| Firm: | 004450 | Firm Name: | APEX+B ELECTRICAL CORP | |
| Firm Phone: | 718-701-9982 | Firm Address: | 10 CEBRA AVENUE STATEN ISLAND NY 10301 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $120.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: E - Four Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JAY & MARY GOLDBERG | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | V - OBJECTION(S) EXIST | |
| Power Requested: | Notice: | 1 - FIRST NOTICE 11/09/2017 | |
| Power Issued: | Response: |
| Follow-Up: | |||
| Contractor's Comments: APARTMENT REWIRING, INSTALLATION OF CIRCUIT BREAKER, RECEPTACLES, SWITCHES, LIGHT FIXTURES. | |||
|
|