| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z157475 | ||
| Premises: 126 CENTRAL PARK SOUTH MANHATTAN | BIN: 1023758 Block: 1011 Lot: 45 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 128 CENTRAL PARK S | Census Tract: 137 | Health Area: 4700 | |
| APT #10AB | Admin Area: Z - UPPER MANHATTAN | Inspection Area: F | ||
| NEW YORK, NY 10019 | Community Board: 105 | |||
| DOB Cross Street(s): AVENUE OF THE AMERICAS, CENTRAL PARK EXIT 7 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 05/18/2018 | Balance Paid By Owner | ||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/14/2016 1:21 PM | |
| Application Entered: 10/14/2016 | Job Start Date: 10/14/2016 | ||
| Last Change: 05/18/2018 | Job End Date: 10/14/2017 | ||
| Appointment Status: | |||
| Last Inspection By: MOSES, DANIEM On 12/07/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011561 | Licensee Name: | YEVGENY KOLTUNOV | |
| Firm: | 004689 | Firm Name: | OPTIMAL ELECTRIC, INC | |
| Firm Phone: | 929-333-9022 | Firm Address: | 279 LAKE STREET, STE 1B BROOKLYN NY 11223 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $189.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | NINO COHEN | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 010 | 10AB | 64 | 68 | 18 | 64 | 1 | 15 | |||||
| Buildings Total | 64 | 68 | 18 | 64 | 15 | |||||||
| Total Units : 229 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 10/14/2016 | Notice: | |
| Power Issued: | 10/14/2016 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 12/07/2017 | 12/11/2017 | DNM | C | (34) | (0) | Y | |||
| INSPECTION COMMENTS: | JOB PASS. | |||||||||